On the Trade-off between Cost and Availability of Virtual Networks

被引:0
|
作者
Herker, Sandra [1 ]
Kiess, Wolfgang [1 ]
An, Xueli [1 ]
Kirstaedter, Andreas [2 ]
机构
[1] DOCOMO Commun Labs Europe GmbH, Munich, Germany
[2] Univ Stuttgart, Inst Commun Networks & Comp Engn, Stuttgart, Germany
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
To minimize cost, Virtual Network Operators (VNOs) need to consider the required network availability already at the network design stage. One generic approach to reach the availability target is to select only high-quality physical network elements that offer high availability and consequently demand high expenses per element. The other generic approach to achieve high availability is to add protection capacity on the level of the virtual network based on lower cost components. In this paper, we analyze both alternatives with a simulation tool to answer the fundamental question how quality can be traded against capacity. For this purpose, we consider different network topologies and the influence of different parameters and provide a framework to find an optimal strategy between Mean Time Between Failures (MTBF) targets for the physical infrastructure and the usage of additional backup paths on the virtual network level.
引用
收藏
页数:9
相关论文
共 50 条
  • [31] The trade-off between wiring cost and network topology in white matter structural networks in health and migraine
    Liu, Jixin
    Zhao, Ling
    Nan, Jiaofen
    Li, Guoying
    Xiong, Shiwei
    von Deneen, Karen M.
    Gong, Qiyong
    Liang, Fanrong
    Qin, Wei
    Tian, Jie
    EXPERIMENTAL NEUROLOGY, 2013, 248 : 196 - 204
  • [32] Initial and continuing compliance and the trade-off between monitoring and control cost
    Harford, JD
    JOURNAL OF ENVIRONMENTAL ECONOMICS AND MANAGEMENT, 2000, 40 (02) : 151 - 163
  • [33] On the trade-off between supplier diversity and cost-effective procurement
    Alcalde, Jose
    Dahm, Matthias
    JOURNAL OF ECONOMIC BEHAVIOR & ORGANIZATION, 2024, 217 : 63 - 90
  • [34] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [35] Trade-Off between Cost and Goodput in Wireless: Replacing Transmitters with Coding
    Kim, MinJi
    Klein, Thierry
    Soljanin, Emina
    Barros, Joao
    Medard, Muriel
    MOBILE NETWORKS AND MANAGEMENT, 2013, 125 : 1 - 14
  • [36] Trade-off between safety and cost in planning construction site layouts
    El-Rayes, K
    Khalafallah, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11): : 1186 - 1195
  • [37] A supporting framework for estimating trade-off between cost and availability at equipment level: development and application in the aircraft MRO industry
    Singh, Vipin Prakash
    Ganguly, Kunal K.
    PRODUCTION PLANNING & CONTROL, 2024, 35 (08) : 808 - 823
  • [38] ESTMATING COST & IMPROVING TRADE-OFF BETWEEN PERFORMANCE AND COST AT THE EARLY DESIGN STAGES
    Saravi, Mohammad
    Newnes, Linda
    Mileham, Tony
    Goh, Yee-Mey
    ICED 09 - THE 17TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, VOL 7: DESIGN FOR X, DESIGN TO X, 2009, : 81 - +
  • [39] A New Idea to LP Model for Time-cost Trade-off in Networks
    ZHAO Guohao
    JING Shentu and ZHANG Yaguang(Scanxi Institute of Economic Management
    Journal of Systems Science and Systems Engineering, 1995, (03) : 250 - 255
  • [40] Optimal procedures for the discrete time cost trade-off problem in project networks
    Demeulemeester, EL
    Herroelen, WS
    Elmaghraby, SE
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) : 50 - 68