Total output operation chart optimization of cascade reservoirs and its application

被引:28
|
作者
Jiang, Zhiqiang [1 ]
Ji, Changming [1 ]
Sun, Ping [1 ]
Wang, Liping [1 ]
Zhang, Yanke [1 ]
机构
[1] North China Elect Power Univ, Sch Renewable Energy, Beijing 102206, Peoples R China
关键词
Cascade reservoirs; Total output operation chart; Operation rules; Discriminant criterion method; Progressive optimality algorithm; Stepwise regression; Li Xianjiang basin; HYDROTHERMAL POWER-SYSTEMS; DIFFERENTIAL EVOLUTION; NEURAL-NETWORK; HYDROPOWER; MODELS; RULES; SIMULATION; WATER;
D O I
10.1016/j.enconman.2014.08.043
中图分类号
O414.1 [热力学];
学科分类号
摘要
With the rapid development of cascade hydropower stations in recent decades, the cascade system composed of multiple reservoirs needs unified operation and management. However, the output distribution problem has not yet been solved reasonably when the total output of cascade system obtained, which makes the full utilization of hydropower resources in cascade reservoirs very difficult. Discriminant criterion method is a traditional and common method to solve the output distribution problem at present, but some shortcomings cannot be ignored in the practical application. In response to the above concern, this paper proposes a new total output operation chart optimization model and a new optimal output distribution model, the two models constitute to a double nested model with the goal of maximizing power generation. This paper takes the cascade reservoirs of Li Xianjiang River in China as an instance to obtain the optimal total output operation chart by the proposed double nested model and the 43 years historical runoff data, progressive searching method and progressive optimality algorithm are used in solving the model. In order to take the obtained total output operation chart into practical operation, mean value method and stepwise regression method are adopted to extract the output distribution ratios on the basis of the optimal simulation intermediate data. By comparing with discriminant criterion method and conventional method, the combined utilization of total output operation chart and output distribution ratios presents better performance in terms of power generation and assurance rate, which proves it is an effective alternative method to deal with the cascade reservoirs joint operation problem. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:296 / 306
页数:11
相关论文
共 50 条
  • [41] Adaptive Genetic Algorithm for Daily Optimal Operation of Cascade Reservoirs and its Improvement Strategy
    Yang, Kan
    Zheng, Jiao
    Yang, Min
    Zhou, Ran
    Liu, Guoshuai
    WATER RESOURCES MANAGEMENT, 2013, 27 (12) : 4209 - 4235
  • [42] Adaptive Genetic Algorithm for Daily Optimal Operation of Cascade Reservoirs and its Improvement Strategy
    Kan Yang
    Jiao Zheng
    Min Yang
    Ran Zhou
    Guoshuai Liu
    Water Resources Management, 2013, 27 : 4209 - 4235
  • [43] A two-layer improved invasive weed optimization algorithm for optimal operation of cascade reservoirs
    Fang, Guo-hua
    Wu, Cheng-jun
    Liao, Tao
    Huang, Xian-feng
    Qu, Bo
    WATER SUPPLY, 2020, 20 (06) : 2311 - 2323
  • [44] Research on Constraint Processing Method of High-dimensional Optimization Operation Problem of Cascade Reservoirs
    He, Zhongzheng
    Li, Shuliang
    Huang, Wei
    Yan, Feng
    Fu, Jisi
    Xiong, Bin
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2024, 56 (06): : 230 - 238
  • [45] Optimization of cascade hydropower system operation by genetic algorithm to maximize clean energy output
    Tayebiyan, Aida
    Mohammad, Thamer Ahmad
    ENVIRONMENTAL HEALTH ENGINEERING AND MANAGEMENT JOURNAL, 2016, 3 (02): : 99 - 106
  • [46] Optimization of the reservoir operation chart of hydropower station and its application-based on hybrid genetic algorithm and simulated annealing
    Shao, Lin
    Wang, Li-Ping
    Huang, Hai-Tao
    Yang, Zi-Jun
    Yu, Shan
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (12): : 40 - 43
  • [47] An Improved “Dynamic Control Operation Module” for Cascade Reservoirs
    Zhongbo Zhang
    Xiaoyan He
    Simin Geng
    Shuanghu Zhang
    Liuqian Ding
    Guangyuan Kan
    Hui Li
    Xiaoming Jiang
    Water Resources Management, 2018, 32 : 449 - 464
  • [48] Combined operation analysis of the cascade reservoirs Longyangxia and Liujiaxia
    Yang, Wenhua
    Sun, Meizhai
    Hedianzixue Yu Tance Jishu/Nuclear Electronics & Detection Technology, 2000, 20 (02): : 12 - 21
  • [49] Model establishment and evaluation of operation function for cascade reservoirs
    Ji, Changming
    Su, Xueling
    Zhou, Ting
    Huang, Haitao
    Wang, Liping
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2010, 34 (03): : 33 - 37
  • [50] An Improved "Dynamic Control Operation Module" for Cascade Reservoirs
    Zhang, Zhongbo
    He, Xiaoyan
    Geng, Simin
    Zhang, Shuanghu
    Ding, Liuqian
    Kan, Guangyuan
    Li, Hui
    Jiang, Xiaoming
    WATER RESOURCES MANAGEMENT, 2018, 32 (02) : 449 - 464