Total output operation chart optimization of cascade reservoirs and its application

被引:28
|
作者
Jiang, Zhiqiang [1 ]
Ji, Changming [1 ]
Sun, Ping [1 ]
Wang, Liping [1 ]
Zhang, Yanke [1 ]
机构
[1] North China Elect Power Univ, Sch Renewable Energy, Beijing 102206, Peoples R China
关键词
Cascade reservoirs; Total output operation chart; Operation rules; Discriminant criterion method; Progressive optimality algorithm; Stepwise regression; Li Xianjiang basin; HYDROTHERMAL POWER-SYSTEMS; DIFFERENTIAL EVOLUTION; NEURAL-NETWORK; HYDROPOWER; MODELS; RULES; SIMULATION; WATER;
D O I
10.1016/j.enconman.2014.08.043
中图分类号
O414.1 [热力学];
学科分类号
摘要
With the rapid development of cascade hydropower stations in recent decades, the cascade system composed of multiple reservoirs needs unified operation and management. However, the output distribution problem has not yet been solved reasonably when the total output of cascade system obtained, which makes the full utilization of hydropower resources in cascade reservoirs very difficult. Discriminant criterion method is a traditional and common method to solve the output distribution problem at present, but some shortcomings cannot be ignored in the practical application. In response to the above concern, this paper proposes a new total output operation chart optimization model and a new optimal output distribution model, the two models constitute to a double nested model with the goal of maximizing power generation. This paper takes the cascade reservoirs of Li Xianjiang River in China as an instance to obtain the optimal total output operation chart by the proposed double nested model and the 43 years historical runoff data, progressive searching method and progressive optimality algorithm are used in solving the model. In order to take the obtained total output operation chart into practical operation, mean value method and stepwise regression method are adopted to extract the output distribution ratios on the basis of the optimal simulation intermediate data. By comparing with discriminant criterion method and conventional method, the combined utilization of total output operation chart and output distribution ratios presents better performance in terms of power generation and assurance rate, which proves it is an effective alternative method to deal with the cascade reservoirs joint operation problem. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:296 / 306
页数:11
相关论文
共 50 条
  • [1] Multi-stage progressive optimality algorithm and its application in energy storage operation chart optimization of cascade reservoirs
    Jiang, Zhiqiang
    Ji, Changming
    Qin, Hui
    Feng, Zhongkai
    ENERGY, 2018, 148 : 309 - 323
  • [2] Extraction and application of energy storage operation chart in Yangtze River cascade reservoirs
    Jiang, Zhiqiang
    Qin, Hui
    Ji, Changming
    Wu, Wenjie
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2018, 18 (06): : 2003 - 2014
  • [3] Chaotic Particle Swarm Optimization Algorithm with Niche and Its Application in Cascade Hydropower Reservoirs Operation
    Huang Xiaofeng
    Ji Changming
    Pei Zheyi
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL I, PROCEEDINGS, 2009, : 568 - 572
  • [4] Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation
    Zhu, Yuxin
    Zhou, Jianzhong
    Zhang, Yongchuan
    Jiang, Zhiqiang
    Jia, Benju
    Fang, Wei
    WATER RESOURCES MANAGEMENT, 2022, 36 (14) : 5751 - 5766
  • [5] Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation
    Yuxin Zhu
    Jianzhong Zhou
    Yongchuan Zhang
    Zhiqiang Jiang
    Benjun Jia
    Wei Fang
    Water Resources Management, 2022, 36 : 5751 - 5766
  • [6] Optimization of Energy Storage Operation Chart of Cascade Reservoirs with Multi-Year Regulating Reservoir
    Liu, Yi
    Jiang, Zhiqiang
    Feng, Zhongkai
    Chen, Yuyun
    Zhang, Hairong
    Chen, Ping
    ENERGIES, 2019, 12 (20)
  • [7] Parallel Particle Swarm Optimization Algorithm and Its Application in the Optimal Operation of Cascade Reservoirs in Yalong River
    Chen Lihua
    Mei Yadong
    Yang Na
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL I, PROCEEDINGS, 2009, : 279 - 282
  • [8] Effect Analysis of Operation Stage Difference on Energy Storage Operation Chart of Cascade Reservoirs
    Zhiqiang Jiang
    Hui Qin
    Changming Ji
    Dechao Hu
    Jianzhong Zhou
    Water Resources Management, 2019, 33 : 1349 - 1365
  • [9] Effect Analysis of Operation Stage Difference on Energy Storage Operation Chart of Cascade Reservoirs
    Jiang, Zhiqiang
    Qin, Hui
    Ji, Changming
    Hu, Dechao
    Zhou, Jianzhong
    WATER RESOURCES MANAGEMENT, 2019, 33 (04) : 1349 - 1365
  • [10] Application of particle swarm optimization and immune evolutionary algorithm to optimal operation of cascade reservoirs
    Wan, Fang
    Yuan, Wenlin
    Huang, Qiang
    Chang, Jianxia
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (01): : 202 - 206