Review on Capacity Optimization of Traction Transformer for High-Speed Railway

被引:0
|
作者
Li R. [1 ]
Xiao L. [1 ]
Lu J. [2 ]
Li X. [2 ]
机构
[1] School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou
[2] School of New Energy and Power Engineering, Lanzhou Jiaotong University, Lanzhou
基金
中国国家自然科学基金;
关键词
capacity optimization; energy storage system; new energy; Traction transformer;
D O I
10.32604/ee.2022.020803
中图分类号
学科分类号
摘要
In electrified railways, traction load not only fluctuates between peaks and valleys, but also has a situation of low utilization rate of average load throughout the day and short overload. The traction transformer selects the capacity with the peak load as the demand boundary, which will cause the capacity utilization rate to be low and even lead to the economic decline of the traction power supply system. This article summarizes the existing configuration methods for capacity optimization of traction transformer. Then under the conditions of energy storage and new energy access to traction power supply system, the three aspects are described as follows. Firstly, the energy storage device is connected to the system, which can pull the capacity of traction transformer to achieve peak shifting and valley filling. Then, the possibility of integrated configuration of new energy and traction power supply system to optimize the capacity of traction transformer and the methods of optimal configuration of traction transformer capacity by using new energy such as wind and light are summarized. Finally, this paper discusses the current structure of new energy access to traction power supply system, and it looks forward to the feasibility of new energy access to traction power supply system cooperating with energy storage devices to optimize the capacity of traction transformer. © 2022, Tech Science Press. All rights reserved.
引用
收藏
页码:2533 / 2548
页数:15
相关论文
共 50 条
  • [41] Traction power supply of high-speed railway transport - modelling and design criteria
    Biesenack, H.
    Lingen, J.V.
    Schmidt, P.
    ETG-Fachberichte (Energietechnische Gesellschaft im VDE), (74):
  • [42] An Improved Feedback Linearization Control Strategy for High-Speed Railway Traction Converters
    Yu W.
    Liu Z.
    Zhang Y.
    Gou J.
    Liu J.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2023, 38 (08): : 2136 - 2147
  • [43] Comprehensive Assessment of Traction Power Supply Sensor System of High-Speed Railway
    Fu, Yanbing
    Chen, Zhiya
    Xie, Meiquan
    Ling, Chunyu
    Zhang, Yunli
    SENSOR LETTERS, 2013, 11 (11) : 2183 - 2185
  • [44] Research on lightning protection performance evaluation of high-speed railway Traction Network
    Yan Biwu
    Gu Shanqiang
    Xiang Nianwen
    Li Tao
    Su Jie
    Lu Zejun
    2014 INTERNATIONAL CONFERENCE ON LIGHTNING PROTECTION (ICLP), 2014, : 850 - 853
  • [45] Integrative compensation method of negative phase sequence and harmonic for high-speed railway traction supply system with V/v transformer
    Wu, Chuan-Ping
    Luo, An
    Xu, Xian-Yong
    Ma, Fu-Jun
    Sun, Juan
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2010, 30 (16): : 111 - 117
  • [46] Review of research on high-speed railway aerodynamics in China
    Hongqi Tian
    Transportation Safety and Environment, 2019, 1 (01) : 1 - 21
  • [47] Review of research on high-speed railway aerodynamics in China
    Tian, Hong-qi
    TRANSPORTATION SAFETY AND ENVIRONMENT, 2019, 1 (01) : 1 - 21
  • [48] High-speed railway channel measurements and characterizations: a review
    Tao ZHOU
    Cheng TAO
    Liu LIU
    Jiahui QIU
    Rongchen SUN
    Journal of Modern Transportation, 2012, 20 (04) : 199 - 205
  • [49] High-speed railway channel measurements and characterizations: a review
    Tao Zhou
    Cheng Tao
    Liu Liu
    Jiahui Qiu
    Rongchen Sun
    Journal of Modern Transportation, 2012, 20 (4): : 199 - 205
  • [50] High-Speed Railway Bridge and Pile Foundation: A Review
    Bachinilla, Brian
    Evangelista, Ana
    Siddhpura, Milind
    Haddad, Assed N.
    da Costa, Bruno B. F.
    INFRASTRUCTURES, 2022, 7 (11)