Risk-constrained optimal bidding strategy for a wind power producer with battery energy storage system using extended mathematical programming

被引:2
|
作者
Abhinav, Rishabh [1 ]
Pindoriya, Naran M. [1 ]
机构
[1] Indian Inst Technol Gandhinagar, Discipline Elect Engn, Gandhinagar 382355, Gujarat, India
关键词
OFFERING STRATEGY; UNCERTAINTY; INTEGRATION; GENERATION; CHALLENGES; FARM;
D O I
10.1049/rpg2.12058
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Wind power producers (WPP) in India, currently, are restricted from participating in the short-term energy market due to the uncertainty in their power generation. Consequently, they might lose an excellent opportunity to maximise their revenue. WPPs, with installed BESS and proper risk management, could promisingly participate in the market and minimise the penalty for deviating from the schedule. This paper devises an optimal bidding strategy for a WPP to participate in the day-ahead and real-time energy markets considering the uncertainties present in wind power generation and market electricity price. At the same time, it also aims to minimise the power deviation during real-time delivery. The paper incorporates CVaR as a risk measure and formulates a two-layer stochastic optimisation problem while employing multiple scenarios of the uncertain data. The upper layer of the problem decides the day-ahead offering, while the lower layer deals with the real-time operation. The stochastic problem is further reformulated using extended mathematical programming, which benefits in reducing the mathematical complexity of the problem. Wind power data from an actual wind farm located in Gujarat, India is taken as a test-study. Various potential case-studies are presented to illustrate the effectiveness of the proposed bidding strategy.
引用
收藏
页码:689 / 700
页数:12
相关论文
共 50 条
  • [21] Optimal Operation Strategy of Energy Storage Applied in Wind Power Integration based on Chance-constrained Programming
    Yuan, Yue
    Li, Qiang
    Wang, Weisheng
    2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, : 1777 - +
  • [22] Flexible Robust Risk-Constrained Unit Commitment of Power System Incorporating Large Scale Wind Generation and Energy Storage
    Zhang, Gaohang
    Li, Fengting
    Xie, Chao
    IEEE ACCESS, 2020, 8 : 209232 - 209241
  • [23] Hybrid Power Plant Bidding Strategy Including a Commercial Compressed Air Energy Storage Aggregator and a Wind Power Producer
    Ghavidel, Sahand
    Ghadi, Mojtaba Jabbari
    Azizivahed, Ali
    Barani, Mostafa
    Aghaei, Jamshid
    Li, Li
    Zhang, Jiangfeng
    2017 AUSTRALASIAN UNIVERSITIES POWER ENGINEERING CONFERENCE (AUPEC), 2017,
  • [24] Optimal Bidding Strategy of a Strategic Wind Power Producer in the Short-Term Market
    Dai, Ting
    Qiao, Wei
    2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [25] Optimal Bidding Strategy of a Strategic Wind Power Producer in the Short-Term Market
    Dai, Ting
    Qiao, Wei
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (03) : 707 - 719
  • [26] RISK-CONSTRAINED OPTIMAL BIDDING STRATEGY FOR A GENERATION COMPANY USING SELF-ORGANIZING HIERARCHICAL PARTICLE SWARM OPTIMIZATION
    Boonchuay, Chanwit
    Ongsakul, Weerakorn
    APPLIED ARTIFICIAL INTELLIGENCE, 2012, 26 (03) : 246 - 260
  • [27] Optimal Energy Management Strategy for Wind Photovoltaic Hybrid System with Battery Storage
    Abbassi, Rabeh
    Chebbi, Souad
    2012 16TH IEEE MEDITERRANEAN ELECTROTECHNICAL CONFERENCE (MELECON), 2012, : 810 - 813
  • [28] Risk-constrained optimal operation of fuel cell/photovoltaic/battery/grid hybrid energy system using downside risk constraints method
    Cao, Yan
    Wang, Qiangfeng
    Cheng, Wen
    Nojavan, Sayyad
    Jermsittiparsert, Kittisak
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2020, 45 (27) : 14108 - 14118
  • [29] Two-stage risk-constrained stochastic optimal bidding strategy of virtual power plant considering distributed generation outage
    Ghasemi-Olanlari, Farzin
    Moradi-Sepahvand, Mojtaba
    Amraee, Turaj
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2023, 17 (08) : 1884 - 1901
  • [30] Look-ahead risk-constrained scheduling of wind power integrated system with compressed air energy storage (CAES) plant
    Aliasghari, Parinaz
    Zamani-Gargari, Milad
    Mohammadi-Ivatloo, Behnam
    ENERGY, 2018, 160 : 668 - 677