Seismic hazard model for loss estimation and risk management in Taiwan

被引:23
|
作者
Campbell, KW
Thenhaus, PC
Barnhard, TP
Hampson, DB
机构
[1] ABS Consulting, Beaverton, OR 97006 USA
[2] EQECAT Inc, Beaverton, OR 97006 USA
[3] ABS Consulting, Evergreen, CO 80439 USA
关键词
earthquakes; portfolio management; risk management; risk modeling; seismic hazard; seismic risk; seismic zonation; seismicity; Taiwan;
D O I
10.1016/S0267-7261(02)00095-7
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
We developed a seismic hazard model for Taiwan that integrates all available tectonic, seismicity, and seismic hazard information in the region to provide risk managers and engineers with a model they can use to estimate earthquake losses and manage seismic risk in Taiwan. The seismic hazard model is composed of two major components: a seismotectonic model and a ground-shaking model. The seismotectonic model incorporates earthquakes that are expected to occur on the Ryukyu and Manila subduction zones, on the intermediate-depth Wadati-Benioff seismicity zones, on the active crustal faults, and within seismotectonic provinces. The active crustal faults include the Chelungpu fault zone, the source of the damaging M-w 7.6 Chi-Chi earthquake, and the Huangchi-Hsiaoyukeng fault zone that forms the western boundary of the Taipei Basin. The ground-shaking model uses both US, worldwide, and Taiwanese attenuation relations to provide robust estimates of peak ground acceleration and response spectral acceleration on a reference site condition for shallow crustal and subduction zone earthquakes. The ground shaking for other site conditions is obtained by applying a nonlinear soil-amplification factor defined in terms of the average shear-wave velocity in the top 30 in of the soil profile, consistent with the methodology used in the current US and proposed Taiwan building codes. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:743 / 754
页数:12
相关论文
共 50 条
  • [41] Seismic Hazard Estimation in Northern Algeria
    Mohamed Hamdache
    Natural Hazards, 1998, 18 : 119 - 144
  • [42] Interval Estimation of Seismic Hazard Parameters
    Orlecka-Sikora, Beata
    Lasocki, Stanislaw
    PURE AND APPLIED GEOPHYSICS, 2017, 174 (03) : 779 - 791
  • [43] Seismic hazard estimation for Mumbai city
    Department of Civil Engineering, Indian Institute of Technology, Guwahati 781 039, India
    不详
    Curr. Sci., 2006, 11 (1486-1494):
  • [44] The communication strategy for the release of the first European Seismic Risk Model and the updated European Seismic Hazard Model
    Dallo, Irina
    Marti, Michele
    Valenzuela, Nadja
    Crowley, Helen
    Dabbeek, Jamal
    Danciu, Laurentiu
    Zaugg, Simone
    Cotton, Fabrice
    Giardini, Domenico
    Pinho, Rui
    Schneider, John F.
    Beauval, Celine
    Correia, Antonio A.
    Ktenidou, Olga-Joan
    Mantyniemi, Paivi
    Pagani, Marco
    Silva, Vitor
    Weatherill, Graeme
    Wiemer, Stefan
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2024, 24 (01) : 291 - 307
  • [45] A first-order seismotectonic regionalization of Mexico for seismic hazard and risk estimation
    Ramon Zuniga, F.
    Suarez, Gerardo
    Figueroa-Soto, Angel
    Mendoza, Avith
    JOURNAL OF SEISMOLOGY, 2017, 21 (06) : 1295 - 1322
  • [46] A first-order seismotectonic regionalization of Mexico for seismic hazard and risk estimation
    F. Ramón Zúñiga
    Gerardo Suárez
    Ángel Figueroa-Soto
    Avith Mendoza
    Journal of Seismology, 2017, 21 : 1295 - 1322
  • [47] Design of a Seismic Hazard Risk Assessment Model for EHV Transmission Grid
    Tseng, Ching-Ya
    Wang, Chien-Hao
    Zheng, Xiang-Yao
    Chiu, Huan-Chieh
    Jiang, Joe-Air
    SMART GRID INSPIRED FUTURE TECHNOLOGIES, 2017, 203 : 87 - 97
  • [48] THE SOCIETY IN FRONT OF THE RISK MANAGEMENT: ABOUT THE SEISMIC HAZARD IN VILLAVICENCIO CITY, COLOMBIA
    Chicangana Monton, German Ernesto
    Vargas Jimenez, Carlos Alberto
    Caneva Rincon, Alexander
    Sanchez, Claudia Mojica
    Hernandez Hernandez, Tulio Aymerich
    Ardila Escobar, Johann
    Bernal Jimenez, Alejandra
    BOLETIN DE GEOLOGIA, 2010, 32 (01): : 125 - 141
  • [49] Smart approach to integrated seismic risk management in major hazard industrial plants
    Ciucci, Mariano
    Vezzari, Valerio
    Marino, Alessandra
    XIX ANIDIS CONFERENCE, SEISMIC ENGINEERING IN ITALY, 2023, 44 : 347 - 354
  • [50] Seismic Risk Management of a Canal System Model
    Hara, Takashi
    Kato, Tomoo
    Nonoyama, Maiko
    Otake, Yu
    Honjo, Yusuke
    GEOTECHNICAL SAFETY AND RISK V, 2015, : 117 - 122