PROFIT ANALYSIS OF THREE UNIT COLD STANDBY SYSTEM WITH CORRELATED FAILURES AND REPAIRS

被引:0
|
作者
Tyagi, Vinay K. [1 ]
Goel, Surbhi [1 ]
机构
[1] MM PG Coll, Dept Stat, Modinagar 201204, India
关键词
Regenerative point technique; cold standby; MTSF; OUT-OF-N; F-SYSTEMS; RELIABILITY;
D O I
暂无
中图分类号
S [农业科学];
学科分类号
09 ;
摘要
A three-unit standby system is discussed wherein two units are operative and arranged in series and one is cold standby. On the failure of a unit, inspection is carried out to detect whether the unit needs to be replaced or can be repaired. Also the failure and repair times of each unit are assumed to be correlated by taking their joint density as a bivariate exponential. Various measures of system effectiveness are obtained by making use of regenerative point technique.
引用
收藏
页码:123 / 130
页数:8
相关论文
共 50 条
  • [31] PROFIT FUNCTION-ANALYSIS OF SYSTEM WITH MIXTURE OF WARM AND COLD STANDBY
    GUPTA, R
    BANSAL, S
    GOEL, LR
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1990, 21 (08) : 1577 - 1587
  • [32] Profit analysis of a two-unit cold standby system model operating under different weather conditions
    M. S. Barak
    Sudesh K. Neeraj
    Life Cycle Reliability and Safety Engineering, 2018, 7 (3) : 173 - 183
  • [33] Reliability Analysis of A Two Non-Identical Unit System with Repair and Replacements having Correlated Failures and Repairs
    Kumar, Pawan
    Bharti, Ankush
    Gupta, Amit
    JOURNAL OF INFORMATICS AND MATHEMATICAL SCIENCES, 2012, 4 (03): : 339 - 350
  • [34] Performance analysis and optimization of a cold standby system subject to δ-shocks and imperfect repairs
    Zhao, Bing
    Yue, Dequan
    Liao, Haitao
    Liu, Yuanhui
    Zhang, Xiaohong
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 208
  • [35] Profit Analysis of a Two Unit Cold Standby System Operating Under Different Weather Conditions Subject to Inspection
    Barak, M. S.
    Neeraj
    Kumari, Sudesh
    APPLICATIONS AND APPLIED MATHEMATICS-AN INTERNATIONAL JOURNAL, 2018, 13 (01): : 67 - 83
  • [36] ANALYSIS OF A 2 UNIT STANDBY SYSTEM WITH PARTIAL FAILURE AND 2 TYPES OF REPAIRS
    GOEL, LR
    KUMAR, A
    RASTOGI, AK
    MICROELECTRONICS AND RELIABILITY, 1984, 24 (05): : 873 - 876
  • [37] A TWO NON-IDENTICAL UNIT STANDBY SYSTEM WITH MINOR AND MAJOR REPAIRS IN PRIORITY UNIT AND CORRELATED FAILURE AND REPAIR
    Chaudhary, Pradeep
    Tyagi, Lavi
    INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2020, 16 (01): : 243 - 250
  • [38] Profit Analysis of a Standby Repairable System with Priority to Preventive Maintenance and Rest of Server Between Repairs
    Aggarwal, Chhama
    Ahlawat, Nitika
    Malik, S. C.
    JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2021, 14 (01): : 57 - 79
  • [39] AVAILABILITY ANALYSIS OF A THREE UNIT COLD STANDBY SYSTEM USING LINDLEY FAILURE AND REPAIR LAWS
    Malik, S. C.
    Nandal, N.
    INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2019, 15 (02): : 543 - 548
  • [40] EFFECTIVENESS ANALYSIS OF A THREE UNIT COLD STANDBY SYSTEM WITH COMMON CAUSE FAILURE AND PREVENTIVE MAINTENANCE
    Sharma, S. C.
    Agrawal, Shinjita
    INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2010, 6 (02): : 677 - 687