Chance-Constrained Scheduling via Conflict-Directed Risk Allocation

被引:0
|
作者
Wang, Andrew J. [1 ]
Williams, Brian C. [1 ]
机构
[1] MIT, Comp Sci & Artificial Intelligence Lab, Cambridge, MA 02139 USA
关键词
ALGORITHM;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Temporal uncertainty in large-scale logistics forces one to trade off between lost efficiency through built-in slack and costly replanning when deadlines are missed. Due to the difficulty of reasoning about such likelihoods and consequences, a computational framework is needed to quantify and bound the risk of violating scheduling requirements. This work addresses the chance-constrained scheduling problem, where actions' durations are modeled probabilistically. Our solution method uses conflict-directed risk allocation to efficiently compute a scheduling policy. The key insight, compared to previous work in probabilistic scheduling, is to decouple the reasoning about temporal and risk constraints. This decomposes the problem into a separate master and subproblem, which can be iteratively solved much quicker. Through a set of simulated car-sharing scenarios, it is empirically shown that conflict-directed risk allocation computes solutions nearly an order of magnitude faster than prior art does, which considers all constraints in a single lump-sum optimization.
引用
收藏
页码:3620 / 3627
页数:8
相关论文
共 50 条
  • [31] Chance-constrained scheduling of hybrid microgrids under transactive energy control
    Daneshvar, Mohammadreza
    Mohammadi-Ivatloo, Behnam
    Zare, Kazem
    Abapour, Mehdi
    Asadi, Somayeh
    Anvari-Moghaddam, Amjad
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2021, 45 (07) : 10173 - 10190
  • [32] Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search
    Grimes, Diarmuid
    Hebrard, Emmanuel
    INFORMS JOURNAL ON COMPUTING, 2015, 27 (02) : 268 - 284
  • [34] Design of microelectromechanical systems for variability via chance-constrained optimization
    Hsiung, Kan-Lin
    INTERNATIONAL MEMS CONFERENCE 2006, 2006, 34 : 162 - 167
  • [35] USE OF RISK PREMIUMS IN CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING
    ASKEW, AJ
    WATER RESOURCES RESEARCH, 1975, 11 (06) : 862 - 866
  • [36] Vendor performance with supply risk: A chance-constrained DEA approach
    Talluri, S
    Narasimhan, R
    Nair, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 100 (02) : 212 - 222
  • [37] Resolving Over-Constrained Temporal Problems with Uncertainty through Conflict-Directed Relaxation
    Yu, Peng
    Williams, Brian
    Fang, Cheng
    Cui, Jing
    Haslum, Patrik
    JOURNAL OF ARTIFICIAL INTELLIGENCE RESEARCH, 2017, 60 : 425 - 490
  • [38] Fuzzy chance-constrained linear fractional programming approach for optimal water allocation
    Guo, Ping
    Chen, Xiaohong
    Li, Mo
    Li, Jianbing
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (06) : 1601 - 1612
  • [39] Chance-constrained admission scheduling of elective surgical patients in a dynamic, uncertain setting
    Vancroonenburg, Wim
    De Causmaecker, Patrick
    Vanden Berghe, Greet
    OPERATIONS RESEARCH FOR HEALTH CARE, 2019, 22
  • [40] Chance constrained project scheduling under risk
    Zafra-Cabeza, A
    Ridao, MA
    Camacho, EF
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1789 - 1794