On scheduling inclined jobs on multiple two-stage flowshops

被引:9
|
作者
Wu, Guangwei [1 ,2 ]
Chen, Jianer [3 ,4 ]
Wang, Jianxin [1 ]
机构
[1] Cent South Univ, Sch Informat Sci & Engn, Changsha 410083, Hunan, Peoples R China
[2] Cent South Univ Forestry & Technol, Coll Comp & Informat Engn, Changsha 410004, Hunan, Peoples R China
[3] Guangzhou Univ, Sch Comp Sci & Educ Software, Guangzhou 510006, Guangdong, Peoples R China
[4] Texas A&M Univ, Dept Comp Sci & Engn, College Stn, TX 77843 USA
基金
中国国家自然科学基金;
关键词
Scheduling; Multiple two-stage flowshops; Online algorithms; Approximation algorithms; Cloud computing; BOUNDS;
D O I
10.1016/j.tcs.2018.04.005
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We study scheduling on multiple two-stage flowshops in which each job has to pass through an R-operation and a T-operation. Motivated by the current research in data centers, we consider two restricted versions of the problem in which the jobs are inclined: one restricts that for each job, the R-operation consumes no less time than the T-operation, while the other assumes that the T-operation consumes no less time than the R-operation for each job. For the first case, we present an online 2-competitive algorithm and an offline 11/6-approximation algorithm. For the second case, we give an online 5/2-competitive algorithm, and prove, for the offline setting, that the problem can be reduced to the problem in the first case. (C) 2018 Elsevier B.V. All rights reserved.
引用
收藏
页码:67 / 77
页数:11
相关论文
共 50 条
  • [31] A Two-Stage Robust Scheduling Optimization of an Energy Hub with Multiple Chance Constraints
    Luo, Yichen
    Xu, Xiao
    Zhang, Zhenyuan
    Li, Pan
    Hu, Weihao
    Liu, Junyong
    2023 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA, I&CPS ASIA, 2023, : 650 - 655
  • [32] A Two-Stage Robust Scheduling Optimization of an Energy Hub With Multiple Chance Constraints
    Luo, Yichen
    Xu, Xiao
    Zhang, Zhenyuan
    Pan, Li
    Hu, Weihao
    Liu, Junyong
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2025, 61 (01) : 1246 - 1255
  • [34] Real-time order flowtime estimation methods for two-stage hybrid flowshops
    Lee, Geun-Cheol
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 42 (01): : 1 - 8
  • [35] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [36] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497
  • [37] A two-stage heuristic algorithm for locomotive scheduling
    Zhang, Jie
    Ni, Shaoquan
    Ge, Lulu
    Wang, Yuanyuan
    Information Technology Journal, 2013, 12 (11) : 2153 - 2159
  • [38] On Approximation Algorithms for Two-Stage Scheduling Problems
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    FRONTIERS IN ALGORITHMICS, FAW 2017, 2017, 10336 : 241 - 253
  • [39] Two-stage Robust Optimal Scheduling for Microgrids
    Duan, Jiandong
    Cheng, Ran
    Wang, Jing
    2021 8TH INTERNATIONAL FORUM ON ELECTRICAL ENGINEERING AND AUTOMATION, IFEEA, 2021, : 505 - 510
  • [40] Logistics scheduling: Analysis of two-stage problems
    Yung-Chia Chang
    Chung-Yee Lee
    Journal of Systems Science and Systems Engineering, 2003, 12 (4) : 385 - 407