An exact branch-and-price algorithm for multitasking scheduling on unrelated parallel machines

被引:39
|
作者
Xiong, Xiaoyun [1 ]
Zhou, Peng [1 ]
Yin, Yunqiang [2 ]
Cheng, T. C. E. [3 ]
Li, Dengfeng [2 ]
机构
[1] China Univ Petr, Sch Econ & Management, Qingdao, Shandong, Peoples R China
[2] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu 610054, Sichuan, Peoples R China
[3] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
branch-and-price; column generation; multitasking; scheduling; COLUMN GENERATION; GENETIC ALGORITHM; TIME;
D O I
10.1002/nav.21863
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the multitasking scheduling problem on unrelated parallel machines to minimize the total weighted completion time. In this problem, each machine processes a set of jobs, while the processing of a selected job on a machine may be interrupted by other available jobs scheduled on the same machine but unfinished. To solve this problem, we propose an exact branch-and-price algorithm, where the master problem at each search node is solved by a novel column generation scheme, called in-out column generation, to maintain the stability of the dual variables. We use a greedy heuristic to obtain a set of initial columns to start the in-out column generation, and a hybrid strategy combining a genetic algorithm and an exact dynamic programming algorithm to solve the pricing subproblems approximately and exactly, respectively. Using randomly generated data, we conduct numerical studies to evaluate the performance of the proposed solution approach. We also examine the effects of multitasking on the scheduling outcomes, with which the decision maker can justify making investments to adopt or avoid multitasking.
引用
收藏
页码:502 / 516
页数:15
相关论文
共 50 条
  • [21] A Branch-and-Price Algorithm or the Bilevel Network Maintenance Scheduling Problem
    Rey, David
    Bar-Gera, Hillel
    Dixit, Vinayak V.
    Waller, S. Travis
    TRANSPORTATION SCIENCE, 2019, 53 (05) : 1455 - 1478
  • [22] A Branch-and-Price Algorithm to Solve a Quay Crane Scheduling Problem
    Kenan, Nabil
    Diabat, Ali
    COMPLEX ADAPTIVE SYSTEMS, 2015, 2015, 61 : 527 - 532
  • [23] Using high performance computing for unrelated parallel machine scheduling with sequence-dependent setup times: Development and computational evaluation of a parallel branch-and-price algorithm
    Rauchecker, Gerhard
    Schryen, Guido
    COMPUTERS & OPERATIONS RESEARCH, 2019, 104 : 338 - 357
  • [24] Exact methods for order acceptance and scheduling on unrelated parallel machines
    Wang, Shijin
    Ye, Benyan
    COMPUTERS & OPERATIONS RESEARCH, 2019, 104 : 159 - 173
  • [25] An enhanced branch-and-price algorithm for the integrated production and transportation scheduling problem
    He, Peiyang
    Li, Kunpeng
    Kumar, P. N. Ram
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (06) : 1874 - 1889
  • [26] Branch-and-Price for Personalized Multiactivity Tour Scheduling
    Restrepo, Maria I.
    Gendron, Bernard
    Rousseau, Louis-Martin
    INFORMS JOURNAL ON COMPUTING, 2016, 28 (02) : 334 - 350
  • [27] A branch-and-price heuristic algorithm for the ART and external truck scheduling problem in an automated container terminal with a parallel layout
    Wang, Zehao
    Zeng, Qingcheng
    Li, Xingchun
    Qu, Chenrui
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 184
  • [28] Optimal Surgical Scheduling Based on Branch-and-Price
    Cheng, Yuanjun
    Luo, Li
    Wang, Tianjin
    2015 12TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2015,
  • [29] Optimal shift scheduling: A branch-and-price approach
    Mehrotra, A
    Murphy, KE
    Trick, MA
    NAVAL RESEARCH LOGISTICS, 2000, 47 (03) : 185 - 200
  • [30] A branch-and-price algorithm for a targeting problem
    Kwon, Ojeong
    Lee, Kyungsik
    Kang, Donghan
    Park, Sungsoo
    NAVAL RESEARCH LOGISTICS, 2007, 54 (07) : 732 - 741