Bi-criteria Scheduling of Scientific Workflows for the Grid

被引:0
|
作者
Wieczorek, Marek [1 ]
Podlipnig, Stefan [1 ]
Prodan, Radu [1 ]
Fahringer, Thomas [1 ]
机构
[1] Univ Innsbruck, Inst Comp Sci, A-6020 Innsbruck, Austria
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The drift towards new challenges in Grid computing, including the Utility Grid paradigm and Service Level Agreements based on quality-of-service guarantees, implies the need for new, robust, multi-criteria scheduling algorithms that can be applied by the user in an intuitive way. Multiple scheduling criteria addressed by the related Grid research include execution time, the cost of running a task on a machine, reliability, and different data quality metrics. The existing bi-criteria scheduling approaches are usually dedicated for certain criterion pairs only that require the user to define one's preferences either as weights assigned to the criteria or as fixed constraints defined for one of the criteria. These requirements are often not feasible for the user and not suited to the specificity of the multi-criteria scheduling problem. We propose a novel requirement specification method based on a sliding constraint, and we model the problem as an extension of the multiple-choice knapsack problem. We propose a general bi-criteria scheduling heuristic called Dynamic Constraint Algorithm (DCA) based on dynamic programming, dedicated to the problem model defined by us. In the experimental study, we show that in most of the problem variants, DCA outperforms two existing algorithms designed for the same problem. It also shows relatively low scheduling times for workflows of medium size.
引用
收藏
页码:9 / 16
页数:8
相关论文
共 50 条
  • [31] Finding the efficient frontier of a bi-criteria, spatially explicit, harvest scheduling problem
    Tóth, SF
    McDill, ME
    Rebain, S
    FOREST SCIENCE, 2006, 52 (01) : 93 - 107
  • [32] Multi-criteria scheduling of scientific workflows in the Workflow as a Service platform
    Tarafdar, Anurina
    Karmakar, Kamalesh
    Das, Rajib K.
    Khatua, Sunirmal
    COMPUTERS & ELECTRICAL ENGINEERING, 2023, 105
  • [33] Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
    Hendizadeh, S. Hamed
    ElMekkawy, Tarek Y.
    Wang, G. Gary
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2007, 1 (04) : 391 - 413
  • [34] Solving a Bi-Criteria Hybrid Flowshop Scheduling Problem Occurring in Apparel Manufacturing
    Montoya-Torres, Jairo R.
    Vargas-Nieto, Fabian
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2011, 4 (02) : 42 - 60
  • [35] A bi-criteria two-machine flowshop scheduling problem with a learning effect
    Chen, P.
    Wu, C-C
    Lee, W-C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (09) : 1113 - 1125
  • [36] Monitoring of Grid scientific workflows
    Balis, Bartosz
    Bubak, Marian
    Labno, Bartlomiej
    SCIENTIFIC PROGRAMMING, 2008, 16 (2-3) : 205 - 216
  • [37] A fuzzy bi-criteria transportation problem
    Keshavarz, Esmaile
    Khorram, Esmaile
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 947 - 957
  • [38] Approximations of bi-criteria optimization problem
    Luca, Traian Ionut
    Duca, Dorel, I
    STUDIA UNIVERSITATIS BABES-BOLYAI MATHEMATICA, 2018, 63 (04): : 549 - 559
  • [39] Bi-criteria Convoy Movement Problem
    Kumar, P. N. Ram
    Narendran, T. T.
    Sivakumar, A. I.
    JOURNAL OF DEFENSE MODELING AND SIMULATION-APPLICATIONS METHODOLOGY TECHNOLOGY-JDMS, 2009, 6 (03): : 151 - 164
  • [40] Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
    Xinchang Hao
    Mitsuo Gen
    Lin Lin
    Gursel A. Suer
    Journal of Intelligent Manufacturing, 2017, 28 : 833 - 845