Optimal Planning of Reliability Life Tests Considering Prior Knowledge

被引:0
|
作者
Dazer, M. [1 ]
Braeutigam, D. [1 ]
Leopold, T. [2 ]
Bertsche, B. [1 ]
机构
[1] Univ Stuttgart, Inst Machine Components, Pfaffenwaldring 9, D-70569 Stuttgart, Germany
[2] Knorr Bremse Syst Nutzfahrzeuge GmbH, Moosacher Str 80, D-80809 Munich, Germany
来源
2018 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS) | 2018年
关键词
Reliability DOE; life testing; test planning; test cost; test time;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
An empirical-statistical demonstration of the lifetime of engineering products is necessary in order to assure fatigue and reliability requirements [1]. Engineers are faced with the challenge of selecting the most suitable test strategy and also the optimal parameter setting, e.g. sample size, in order to realize reliability demonstration with limited costs, time and with their available testing resources. In this paper, different test strategies such as Sudden Death, time-censored, failure-censored and non-censored tests, and the Success Run Test are compared in a Reliability DOE concerning the necessary time, costs and the Probability of Success of the whole test configuration. The DOE is carried out with standardized cost and time data and the results can therefore be used generally and are transferable to any other product. With the resulting data, the different test strategies are comparable in terms of different boundary conditions. The Probability of Success can be determined and compared for the different strategies with a very low computing time in terms of cost and time. Using these results, engineers are now able to select the most suitable test procedure for their individual reliability requirements. Finally, the applicability is presented in a case study, showing the difference between different test strategies for the demonstration of a specific reliability target.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Optimal Process Planning of CNG Pressure Vessel by Ensuring Reliability and Improving Die Life
    Bae, Jun Ho
    Lee, Hyun Woo
    Kim, Moon Saeng
    Kim, Chul
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2013, 37 (07) : 865 - 873
  • [32] Optimal planning of battery energy storage considering reliability benefit and operation strategy in active distribution system
    Liu, Wenxia
    Niu, Shuya
    Xu, Huiting
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2017, 5 (02) : 177 - 186
  • [33] CONSIDERING PRIOR KNOWLEDGE WHEN USING ELABORATIVE INTERROGATION
    WOLOSHYN, VE
    WOOD, E
    WILLOUGHBY, T
    APPLIED COGNITIVE PSYCHOLOGY, 1994, 8 (01) : 25 - 36
  • [34] Optimal Planning of the Microgrid Considering Optimal Sizing of the Energy Resources
    Candra O.
    Ahmed O.A.
    Alzubaidi L.H.
    Sharma M.K.
    Rodriguez-Benites C.
    Mude I.S.
    International Journal of Applied and Computational Mathematics, 2024, 10 (3)
  • [35] Planning of the automatic circuit breaker tests for their reliability
    BELA-BELOV AM
    YAKOVLEV VA
    1971, (06): : 677 - 679
  • [36] PLANNING LARGE SYSTEMS RELIABILITY GROWTH TESTS
    SMITH, DK
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1984, (NSYM): : 471 - 475
  • [38] APPLICATION OF EXPERIMENTAL PLANNING FOR ACCELERATION OF RELIABILITY TESTS
    KALEDIN, BA
    DOKLADY AKADEMII NAUK BELARUSI, 1976, 20 (01): : 36 - 37
  • [39] PLANNING OF COMPONENT TESTS FOR CONFIRMATION OF SYSTEM RELIABILITY
    GROYSBERG, LB
    SOVIET JOURNAL OF COMPUTER AND SYSTEMS SCIENCES, 1986, 24 (02): : 146 - 153
  • [40] INFLUENCE OF PLANNING CRITERIA AND RELIABILITY TESTS FOR INTE
    LANTERI, M
    SESTINI, D
    ELETTROTECNICA, 1972, 59 (07): : 798 - &