Mass Customization Challenges of Engineer-to-Order Manufacturing

被引:1
|
作者
Thomassen, Maria K. [1 ]
Alfnes, Erlend [2 ]
机构
[1] SINTEF Technol & Soc, Ind Management, Trondheim, Norway
[2] Norwegian Univ Sci & Technol, Dept Prod & Qual Engn, Trondheim, Norway
来源
关键词
POINT;
D O I
10.1007/978-3-319-29058-4_3
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:27 / 39
页数:13
相关论文
共 50 条
  • [41] Applicability of the capability maturity model for engineer-to-order firms
    Veldman, Jasper
    Klingenberg, Warse
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2009, 48 (02) : 219 - 239
  • [42] Implications of automation in engineer-to-order production:a case study
    Borge Sjobakk
    Maria Kollberg Thomassen
    Erlend Alfnes
    Advances in Manufacturing, 2014, 2 (02) : 141 - 149
  • [43] The impact of design uncertainty in engineer-to-order project planning
    Vaagen, Hajnalka
    Kaut, Michal
    Wallace, Stein W.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 1098 - 1109
  • [44] Product life cycle management in engineer-to-order industries
    Hicks, Christian
    McGovern, Tom
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2009, 48 (02) : 153 - 167
  • [45] Identifying profitable reference architectures in an engineer-to-order context
    Lokkegaard, Martin
    Bertram, Christian Alexander
    Mortensen, Niels Henrik
    Hvam, Lars
    Haug, Anders
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1358 - 1372
  • [46] Optimal Purification Decisions for Engineer-to-Order Proteins at Aldevron
    Martagan, Tugce
    Krishnamurthy, Ananth
    Leland, Peter A.
    Maravelias, Christos T.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2016, 25 (12) : 2003 - 2005
  • [47] Supply chain management in construction and engineer-to-order industries
    Cigolini, Roberto
    Gosling, Jonathan
    Iyer, Ananth
    Senicheva, Olga
    PRODUCTION PLANNING & CONTROL, 2022, 33 (9-10) : 803 - 810
  • [48] A supply chain flexibility framework for engineer-to-order systems
    Gosling, Jonathan
    Naim, Mohamed
    Towill, Denis
    PRODUCTION PLANNING & CONTROL, 2013, 24 (07) : 552 - 566
  • [49] Procurement and Contractual Choices for Engineer-to-Order Supply Chains
    Gosling J.
    Hewlett B.
    Naim M.
    IEEE Engineering Management Review, 2021, 49 (01): : 174 - 180
  • [50] Developing due dates in an engineer-to-order engineering environment
    Grabenstetter, Douglas H.
    Usher, John M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (21) : 6349 - 6361