ROCKBURST PREDICTION IN PUBUGOU HYDROPOWER STATION

被引:0
|
作者
Zhang, Ru [1 ]
Xie, He-Ping [1 ]
Deng, Jian-Hui [1 ]
Fei, Wen-Ping [1 ]
Gao, Ming-Zhong [1 ]
机构
[1] Sichuan Univ, Coll Hydraul & Hydroelect Engn, State Key Lab Hydraul & Mt River Engn, Chengdu, Peoples R China
关键词
CATASTROPHIC FAILURE; SEISMICITY;
D O I
暂无
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
In southwest China, many Hydropower Stations in construction are located in high geostress regions. Rockburst has taken place in the underground powerhouse of the Ertan, Pubugou, and Jinping Hydropower Stations. Research on rockburst prediction in the Pubugou Hydropower Station has been studied as the following procedure. Initially, according to the Barton Stress criterion and the initial stress, the rockburst possibility is assessed as the slight-moderate level. Next, granite rock samples are obtained from the underground powerhouse, and Elastic Deformation Energy Index Wet is tested. Herein, rockburst possibility is also evaluated as the slight-moderate level. Lastly, the disturbed stress distribution during excavation is calculated through 3D numerical simulations. The results show that the slight-moderate rockbursts tends to occur in some places of the main cavern, and intensive rockbursts trend to happen in few places. These research results are in accordance with the field observations.
引用
收藏
页码:457 / 462
页数:6
相关论文
共 50 条
  • [42] Stabilising a hydropower station cavern
    Tasmania, Hydro
    International Water Power and Dam Construction, 2015, 67 (12): : 26 - 28
  • [43] Refurbishment of hydropower station Zakucac
    Sander, M
    STROJARSTVO, 1996, 38 (4-5): : 185 - 206
  • [44] Real-time landslide monitoring of Pubugou hydropower resettlement zone using continuous GPS
    Xiao, Ruya
    He, Xiufeng
    NATURAL HAZARDS, 2013, 69 (03) : 1647 - 1660
  • [45] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 10 - 13
  • [46] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 512 - 517
  • [47] Tempo-spatial characteristics and influential factors of rockburst:a case study of transportation and drainage tunnels in Jinping Ⅱ hydropower station附视频
    Lipeng Liu Xiaogang Wang Yizhong Zhang Zhixin Jia Qingwei Duan Department of Geotechnical Engineering China Institute of Water Resources and Hydropower Research Beijing China School of Engineering and Technology China University of Geosciences Beijing China Beijing Vibroflotation Engineering Co Ltd Beijing China
    Journal of Rock Mechanics and Geotechnical Engineering, 2011, (02) : 179 - 185
  • [48] Stability prediction of reservoir landslide of Lijiaxia Hydropower station before and after reservoir impounding
    Bai, Jun-Guang
    Lu, Sheng-Di
    Han, Jian-She
    Yantu Lixue/Rock and Soil Mechanics, 2008, 29 (07): : 1723 - 1731
  • [49] A Method for Rockburst Prediction in the Deep Tunnels of Hydropower Stations Based on the Monitored Microseismicity and an Optimized Probabilistic Neural Network Model
    Feng, Guangliang
    Xia, Guoqing
    Chen, Bingrui
    Xiao, Yaxun
    Zhou, Ruichen
    SUSTAINABILITY, 2019, 11 (11)
  • [50] Stability prediction of reservoir landslide of Lijiaxia Hydropower station before and after reservoir impounding
    Bai Jun-guang
    Lu Sheng-di
    Han Jian-she
    ROCK AND SOIL MECHANICS, 2008, 29 (07) : 1723 - 1731