Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal

被引:66
|
作者
Luo, Jiabin [1 ]
Wu, Yue [2 ]
Mendes, Andre Bergsten [3 ]
机构
[1] Coventry Univ, Fac Engn & Comp, Priory St, Coventry CV1 5FB, W Midlands, England
[2] Univ Southampton, Southampton Business Sch, Southampton SO17 1BJ, Hants, England
[3] Univ Sao Paulo, Dept Naval Architecture & Ocean Engn, Ave Prof Mello Moraes 2231, BR-05508030 Sao Paulo, Brazil
关键词
Integer programming; Automated container terminal; Vehicle scheduling; Container storage; Container unloading; OPERATIONS-RESEARCH; ALLOCATION PROBLEM; GENETIC ALGORITHM; TRANSSHIPMENT HUB; SPACE ALLOCATION; GUIDED VEHICLE; ASSIGNMENT; CRANE; PORT; STRATEGY;
D O I
10.1016/j.cie.2016.01.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Effectively scheduling vehicles and allocating storage locations for containers are two important problems in container terminal operations. Early research efforts, however, are devoted to study them separately. This paper investigates the integration of the two problems focusing on the unloading process in an automated container terminal, where all or part of the equipment are built in automation. We formulate the integrated problem as a mixed-integer programming (MIP) model to minimise ship's berth time. We determine the detailed schedules for all vehicles to be used during the unloading process and the storage location to be assigned for all containers. A series of experiments are carried out for small sized problems by using commercial software. A genetic algorithm (GA) is designed for solving large sized problems. The solutions from the GA for the small-sized problems are compared with the optimal solutions obtained from the commercial software to verify the effectiveness of the GA. The computational results show that the model and solution methods proposed in this paper are efficient in solving the integrated unloading problem for the automated container terminal. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:32 / 44
页数:13
相关论文
共 50 条
  • [21] Integrated scheduling of handling equipment at automated container terminals
    Henry Y. K. Lau
    Ying Zhao
    Annals of Operations Research, 2008, 159 : 373 - 394
  • [22] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 373 - 394
  • [23] A Metaheuristic Algorithms for Optimization of Integrated Scheduling of Cranes and Storage Platforms at Automated Container Terminals
    Garmouch, Hamza
    Abdoun, Otman
    DIGITAL TECHNOLOGIES AND APPLICATIONS, ICDTA 2024, VOL 2, 2024, 1099 : 316 - 325
  • [24] A research on the container vehicle routing planning in the container terminal
    Li, Dong
    Wang, Dingwei
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 213 - 220
  • [25] Inbound container remarshaling problem in an automated container terminal
    Jin, Bo
    Yu, Zhishan
    Yu, Mingzhu
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 168
  • [26] A fuzzy vehicle-crane scheduling problem in container terminal
    Zhou, Pengfel
    Guo, Zijian
    Lin, Li
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3593 - 3598
  • [27] Scheduling of twin automatic stacking cranes and automated guided vehicle considering buffer mode on automated container terminal
    Zhu, Jin
    Ma, Feiyang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 193
  • [28] Optimization of Container Terminal Problems: An Integrated Solution Approach
    Exposito-Izquierdo, Christopher
    Lalla-Ruiz, Eduardo
    Melian Batista, Belen
    Marcos Moreno-Vega, J.
    COMPUTER AIDED SYSTEMS THEORY, PT 1, 2013, 8111 : 324 - 331
  • [29] Terminal Container Automated Guided Vehicle Based on Lidar Navigation
    Deng, Yefeng
    Liu, Qingyu
    Jun Bao
    Sun, Hongwei
    He, Jiajian
    Lei Lu
    OPTICAL METHODS FOR INSPECTION, CHARACTERIZATION, AND IMAGING OF BIOMATERIALS IV, 2019, 11060
  • [30] An integrated scheduling method for AGVs in an automated container terminal considering battery swapping and battery degradation
    Li, Yuqing
    Li, Linman
    Liu, Ran
    Pan, Ershun
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024,