WATERSHED MODELLING AS A FUNCTION OF GEOTECHNICAL INVESTIGATIONS

被引:0
|
作者
Vukelic-Sutoska, Marija [1 ]
Vukelic, Ivica [2 ]
机构
[1] Univ St Cyril & Methudius, Fac Agr & Food, Skopje 91000, Macedonia
[2] Enterprise Cesta, Zagreb, Croatia
关键词
geologic investigations; information systems; watershed modeling; watershed yield;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Methods of estimating yield front ungaged watershed may be by using of climatic factors, only geographic location and watershed and climatic factors. Methods for estimating yields, as regional analysis, water accounting. direct runoff method, climatic and geographic factors, Should be considered as giving estimates so broad that the influence of specific factors have large margins or error. Hydrologic simulation models in watershed modelling use mathematical equations to calculate results like runoff volume or peak flow. Those models can be classified as either theoretical or empirical models. A theoretical model includes a set of general laws or theoretical principles. Further, depending oil the character of the results obtained, models are classified as stochastic or deterministic. In this paper are analysed methods for estimating yields, event versus continous models (empirical model, linear system transfer functions, explicit moisture accounting model-conceptual, physical process model) and generalities of watershed models (hydrodynamics and water quality of land surface runoff, groundwater and freshwater hydrodynamics and water). Purpose and scope are in procedure and methods for conducting geologic investigations related to sedimentation, engineering geology, and groundwater for work plan development.
引用
收藏
页码:33 / +
页数:3
相关论文
共 50 条
  • [21] ROCK MECHANICS/GEOTECHNICAL INVESTIGATIONS.
    Knight, David
    Colliery Guardian, 1979, 227 (03): : 162 - 169
  • [22] Geotechnical investigations on modified steel slags
    Barka, Elissavet
    Birle, Emanuel
    Demond, Derik
    GEOTECHNIK, 2019, 42 (04) : 212 - 218
  • [23] Geotechnical investigations for tunneling & pipe jacking
    Raines, GL
    PIPELINES IN THE CONSTRUCTED ENVIRONMENT, 1998, : 516 - 527
  • [24] CONNECTING GEOTECHNICAL INVESTIGATIONS WITH PROJECT RISK
    Kelly, R. B.
    Drechsler, M.
    Goldsmith, R.
    AUSTRALIAN GEOMECHANICS JOURNAL, 2020, 55 (01): : 127 - 136
  • [25] Deepwater geotechnical investigations in the Gulf of Mexico
    Pelletier, JH
    Doyle, EH
    Dutt, RN
    UNDERWATER TECHNOLOGY, 1996, 22 (02): : 63 - 73
  • [26] Modelling of submarine slides in the geotechnical centrifuge
    Boylan, N.
    Gaudin, C.
    White, D. J.
    Randolph, M. F.
    PHYSICAL MODELLING IN GEOTECHNICS, VOLS. 1 AND 2, 2010, : 1095 - 1100
  • [27] Determining the interfaces parameters for geotechnical modelling
    Ter-Martirosyan, Armen
    Sidorov, Vitalii
    Almakaeva, Anastasia
    XXII INTERNATIONAL SCIENTIFIC CONFERENCE: CONSTRUCTION THE FORMATION OF LIVING ENVIRONMENT (FORM-2019), 2019, 97
  • [28] An approach for rotational hardening in geotechnical modelling
    Dattola, Giuseppe
    Fotia, Grazia
    Mortara, Giuseppe
    VI ITALIAN CONFERENCE OF RESEARCHERS IN GEOTECHNICAL ENGINEERING, CNRIG2016 - GEOTECHNICAL ENGINEERING IN MULTIDISCIPLINARY RESEARCH: FROM MICROSCALE TO REGIONAL SCALE, 2016, 158 : 104 - 109
  • [29] Modelling of hydrological responses: the representative elementary watershed approach as an alternative blueprint for watershed modelling
    Reggiani, P
    Schellekens, J
    HYDROLOGICAL PROCESSES, 2003, 17 (18) : 3785 - 3789
  • [30] Adaptive ground modelling in geotechnical engineering
    Schönhardt, M
    Witt, KJ
    GEOTECHNICAL MEASUREMENTS AND MODELLING, 2003, : 297 - 305