Efficient safety management for subcontractor at construction sites

被引:0
|
作者
Son, Ki Sang [1 ]
Park, Jeong Jin [1 ]
机构
[1] Seoul Natl Univ Technol, Dept Safety Engn, Seoul, South Korea
关键词
accidents; subcontractors; safety management cost; the lowest contract system; deducted cost;
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The present research seeks to offer an in-depth analysis of safety management cost that is handed down to subcontractor by its general contractor. In so doing, this research will thoroughly evaluate how safety management cost is used and handled by subcontractor and present an overview of the intricate relation between construction safety standard and its safety management cost. Only two of ten scaffolders continued to work until their work finished at one construction site while eight of them moved from one work site to another. Consequently, a general contractor could not provide more effective safety training. Eventually, the same training contents had been administered to no avail. This questionnaire survey has been administered to the CEO who is working directly at a construction site as a subcontractor in order to find out the currently occurring problems, and the possible solution. 85 percent of the respondents replied that the lowest bidder contract system is the first reason for not receiving an order. Therefore, the current bidding and awarding of a contract system cannot contribute to establishing reasonable safety management cost for subcontract works. Questionnaire survey result was verified by kappa and Annova analysis. It is shown that they are P-value = 0, 000, DF = 1, Chi-sq = 43,561. A verification chi-square was made for reasonability of safety management cost which subcontractors are spending based on the subcontract amount received from a general contractor. kappa(2) (kai analysis) test (chi-square test) shows that p-value is "0,000" Therefore, null hypothesis is disregarded. It is safe to assume that the subcontractor's allocation of their safety management cost depends on how much of safety management cost the subcontractor receives from its general contractor. The insufficient amount of safety management cost, as provided by general contractor, may be due to the undervalued safety management cost received by the general contractor upon signing of the contract for which the general contractor's presence was needed in the first place. Consequently, there must be some sort of a mechanism to evaluate, analyze and improve the relaying of safety management cost between general contractor and its subcontractor(s). It is thought that establishment of a feedback system between awarding system of a general contractor with reasonable contract amount and subcontractor is a key method to ensure subcontractor's safety cost.
引用
收藏
页码:1481 / 1487
页数:7
相关论文
共 50 条
  • [41] Safety Leadership: A Catalyst for Positive Safety Climate on Construction Sites
    Sankar, S. Senthamizh
    Anandh, K. S.
    Prasanna, K.
    BUILDINGS, 2024, 14 (06)
  • [42] Managing subcontractor supply chain for quality in construction
    Karim, Khalid
    Marosszeky, Marton
    Davis, Steven
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (01) : 27 - +
  • [43] Safety improvement on building construction sites in Qatar
    Senouci, Ahmed
    Al-Abbadi, Ibrahim
    Eldin, Neil
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 504 - 509
  • [44] Investigating Safety Violations on Nigerian Construction Sites
    Ebekozien, Andrew
    Aigbavboa, Clinton
    Samsurijan, Mohamad Shaharudin
    Radin Firdaus, Radin Badarudin
    Rohayati, Mohd Isa
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1454 - 1464
  • [45] Health and Safety on Construction Sites in Cape Verde
    Palhinha, Paulo
    SHO2016: INTERNATIONAL SYMPOSIUM ON OCCUPATIONAL SAFETY AND HYGIENE, 2016, : 239 - 241
  • [46] Prospective safety performance evaluation on construction sites
    Wu, Xianguo
    Liu, Qian
    Zhang, Limao
    Skibniewski, Miroslaw J.
    Wang, Yanhong
    ACCIDENT ANALYSIS AND PREVENTION, 2015, 78 : 58 - 72
  • [47] Analysis of the safety conditions of scaffolding on construction sites
    Carlos Rubio-Romero, Juan
    Rubio Gamez, M. Carmen
    Antonio Carrillo-Castrillo, Jesus
    SAFETY SCIENCE, 2013, 55 : 160 - 164
  • [48] Improving construction productivity: a subcontractor's perspective
    Loosemore, Martin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (03) : 245 - +
  • [49] Subcontractor procurement in construction: the interplay of price and trust
    Hartmann, Andreas
    Caerteling, Jasper
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2010, 15 (05) : 354 - 362
  • [50] Contaminated soil management at construction sites
    Lafebre, Hilda
    Songonuga, Olu
    Kathuria, Ajay
    Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management, 1998, 2 (03): : 115 - 119