Scheduling-based risk estimation and safety planning for construction projects

被引:60
|
作者
Yi, Kyoo-Jin
Langford, David
机构
[1] Univ Strathclyde, Dept Architecture & Bldg Sci, Glasgow G4 0NG, Lanark, Scotland
[2] Hankyong Natl Univ, Dept Safety Engn, Ansung 456749, Kyonggi Do, South Korea
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:6(626)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.
引用
收藏
页码:626 / 635
页数:10
相关论文
共 50 条
  • [21] SPATIAL ANALYSIS BASED HEALTH AND SAFETY RISK ASSESSMENT FOR LINEAR CONSTRUCTION PROJECTS
    Atay, H.
    Toz, G.
    XXII ISPRS CONGRESS, TECHNICAL COMMISSION VIII, 2012, 39-B8 : 77 - 82
  • [22] Bayesian-network-based safety risk assessment for steel construction projects
    Leu, Sou-Sen
    Chang, Ching-Miao
    ACCIDENT ANALYSIS AND PREVENTION, 2013, 54 : 122 - 133
  • [23] Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects
    Schatteman, Damien
    Herroelen, Willy
    Van de Vonder, Stijn
    Boone, Anton
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 885 - 893
  • [24] Safety risk assessment in construction projects at Hasanuddin University
    Darwis, A. Muflihah
    Nai'em, M. Furqaan
    Thamrin, Yahya
    Noviponiharwani
    Rahmadani, Suci
    Amin, Fauziah
    GACETA SANITARIA, 2021, 35 : S385 - S387
  • [25] Petri Net-based scheduling of construction projects
    Sawhney, A
    Mund, A
    Chaitavatputtiporn, T
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2003, 20 (04) : 255 - 271
  • [26] Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
    Aminbakhsh, Saman
    Gunduz, Murat
    Sonmez, Rifat
    JOURNAL OF SAFETY RESEARCH, 2013, 46 : 99 - 105
  • [27] Sensor Scheduling-Based Detection of False Data Injection Attacks in Power System State Estimation
    Obata, Sho
    Kobayashi, Koichi
    Yamashita, Yuh
    2021 IEEE INTERNATIONAL CONFERENCE ON CONSUMER ELECTRONICS (ICCE), 2021,
  • [28] Ergonomic Risk Mitigation through Workforce Planning for Construction Projects
    Tao, Yu
    Hu, Hao
    Xu, Feng
    Zhang, Zhipeng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (04)
  • [29] Risk-based safety impact assessment methodology for underground construction projects in Korea
    Seo, J. W.
    Choi, Hyun Ho
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (01) : 72 - 81
  • [30] Sensor Scheduling-Based Detection of False Data Injection Attacks in Power System State Estimation
    Obata, Sho
    Kobayashi, Koichi
    Yamashita, Yuh
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2022, E105A (06) : 1015 - 1019