Scheduling-based risk estimation and safety planning for construction projects

被引:60
|
作者
Yi, Kyoo-Jin
Langford, David
机构
[1] Univ Strathclyde, Dept Architecture & Bldg Sci, Glasgow G4 0NG, Lanark, Scotland
[2] Hankyong Natl Univ, Dept Safety Engn, Ansung 456749, Kyonggi Do, South Korea
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:6(626)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.
引用
收藏
页码:626 / 635
页数:10
相关论文
共 50 条
  • [1] Activity based risk assessment and safety cost estimation for residential building construction projects
    Gurcanli, G. Emre
    Bilir, Senem
    Sevim, Merve
    SAFETY SCIENCE, 2015, 80 : 1 - 12
  • [2] SAFETY PLANNING FOR CONSTRUCTION AND ALTERATION PROJECTS
    BERGTRAUN, EM
    CHEMICAL ENGINEERING, 1978, 85 (05) : 133 - 134
  • [3] Optimal planning and scheduling for repetitive construction projects
    Hyari, K
    El-Rayes, K
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2006, 22 (01) : 11 - 19
  • [4] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [5] Collaborative supply chain planning and scheduling of construction projects
    Elmughrabi, Walid
    Ben Sassi, Oumaima
    Dao, Thien-My
    Chabaane, Amin
    IFAC PAPERSONLINE, 2020, 53 (02): : 10761 - 10766
  • [6] Finite-capacity scheduling-based planning for revenue-based capacity management
    Akkan, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 170 - 179
  • [7] Gain scheduling-based friction compensation
    Bozic, A
    Deur, J
    Peric, N
    IAS 2000 - CONFERENCE RECORD OF THE 2000 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-5, 2000, : 1089 - 1095
  • [8] InfoLeak: Scheduling-based Information Leakage
    Vateva-Gurova, Tsvetoslava
    Manzoor, Salman
    Huang, Yennun
    Suri, Neeraj
    2018 IEEE 23RD PACIFIC RIM INTERNATIONAL SYMPOSIUM ON DEPENDABLE COMPUTING (PRDC), 2018, : 44 - 53
  • [9] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437
  • [10] Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects
    AlNasseri, Hammad
    Aulin, Radhlinah
    ENGINEERING MANAGEMENT JOURNAL, 2015, 27 (02) : 58 - 72