Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time-cost-quality-safety trade-off in construction projects

被引:29
|
作者
Sharma, Kamal [1 ]
Trivedi, Manoj Kumar [1 ]
机构
[1] Madhav Inst Sci & Technol, Dept Civil Engn, Gwalior, Madhya Pradesh, India
关键词
Time-cost-quality-safety trade-off; optimization; construction projects; Latin hypercube sampling; NSGA III; SCHEDULING PROBLEM; GENETIC ALGORITHMS; CONVERGENCE; MANAGEMENT;
D O I
10.1080/15623599.2020.1843769
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many researchers have paid significant amount of attention for the development of time-cost, time-cost-quality and time-cost-safety trade-off optimization models. However, there is still a need to integrate the quality and safety together in time-cost trade-off optimization. To fill this gap, considering the multimode activities in project, this paper presents a multimode resource-constrained time-cost-quality-safety trade-off optimization model. Besides, this study considered the limited availability of resources for each execution mode of activities. A population-based meta-heuristics approach the nondominated sorting genetic algorithm III (NSGA III) is employed to develop the model. Also, Latin hypercube sampling for population initialization, analytical hierarchy process for quality determination and fuzzy logic for safety parameters determination are used. A case study of building construction project is used to demonstrate the applicability of proposed model. Whereas, the measure of various performance metrics and comparisons with existing trade-off optimization models demonstrate the effectiveness of proposed model in simultaneous optimization of four objectives. Moreover, a value path plot is prepared for the visualization of more than three objectives and a priori approach is presented to select one solution from obtained Pareto-optimal front.
引用
收藏
页码:3158 / 3168
页数:11
相关论文
共 32 条
  • [21] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [22] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [23] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [24] A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development
    Hashemi, Reza
    Shahbandarzadeh, Hamid
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 323 - 330
  • [25] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104
  • [26] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
  • [27] Multi-modal optimization for time–cost–quality–work continuity trade-off in construction projects using a hybrid based on SMA and M&C
    Son P.V.H.
    Khoi L.N.Q.
    Asian Journal of Civil Engineering, 2024, 25 (2) : 1825 - 1839
  • [28] A ROBUST TIME-COST-QUALITY-ENERGY-ENVIRONMENT TRADE-OFF WITH RESOURCE-CONSTRAINED IN PROJECT MANAGEMENT: A CASE STUDY FOR A BRIDGE CONSTRUCTION PROJECT
    Lotfi, Reza
    Yadegari, Zahra
    Hosseini, Seyed Hossein
    Khameneh, Amir Hossein
    Tirkolaee, Erfan Babaee
    Weber, Gerhard-Wilhelm
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 375 - 396
  • [29] Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology
    Kandipilli Mehar Kumar
    Deepanshu Agrawal
    Vinod Kumar Vishwakarma
    Mohammad Azim Eirgash
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5975 - 5988
  • [30] A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
    Polancos, Ronaldo V.
    Seva, Rosemary R.
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (03) : 272 - 288