Wastewater Treatment for the Coke Oven Batteries at U. S. Steel Canada Hamilton Works

被引:0
|
作者
Thomson, Michael A. [1 ]
Olthof, Meint [2 ]
Shelby, Sam, Jr. [2 ]
Sebestyen, Andrew [3 ]
Sejevick, Ronald [3 ]
Bowman, Robert [3 ]
Iqbal, Javed [3 ]
Tristani, Roger [3 ]
机构
[1] ENVIRON EC Canada Inc, 2400 Meadowpine Blvd, Mississauga, ON L5N 6S2, Canada
[2] ENVIRON Int Corp, Nashville, TN 37027 USA
[3] US Steel Canada Hamilton Works, Hamilton, ON L8N 3T1, Canada
关键词
Coke plant wastewater treatment; nitrification; denitrification; fluoride; cyanide; startup; initial operations;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
U. S Steel Canada Inc owns and operates a coke production facility in Hamilton, Ontario, Canada. The effluent from the facility is discharged to the City of Hamilton's sanitary sewer and must meet strict pretreatment limits for phenol, cyanide, fluoride, phosphorus, suspended solids, BOD5, TKN and PAH. ENVIRON was retained to assist with developing the treatment process to meet these limits. The unit operations selected were: Biological treatment including nitrification and denitrification using the MS integral clarifier system. COD (including phenol) and ammonium are oxidized while nitrate is removed in an anoxic zone by reaction with a portion of incoming COD. Precipitation of residual complexed cyanide followed by solids removal. Precipitation of fluoride by calcium and aluminum followed by solids removal. Dewatering of chemical and biological sludges using a belt press, either combined or segregated. After a 3 month pilot study on site, ENVIRON developed the detailed design and the facility was constructed. Start up operations began in the spring of 2012 and the treatment plant has been fully operational since June 2012. This paper describes the treatment plant operations and present performance data for the unit operations.
引用
收藏
页码:73 / 86
页数:14
相关论文
共 50 条
  • [1] Development of burden distribution technology at U. S. steel Canada's hamilton works 'E' blast furnace
    Zhao, Yongfu
    Capo, Jerry C.
    McKnight, Steven J.
    D'Alessio, John
    Ferron, Kyle J.
    Badgley, Peter F.
    Gao, Zhengkai
    Gao, Tai
    Iron and Steel Technology, 2011, 8 (01): : 52 - 61
  • [2] Reliable and maintenance-free, radio-based positioning system for coke plant battery cars at U. S. Steel Canada - Hamilton works
    Boric, Thomas
    La Bruna, Edgardo
    Marsonet, Fernando
    Iron and Steel Technology, 2013, 10 (12): : 82 - 85
  • [3] Reliable and Maintenance-Free, Radio-Based Positioning System for Coke Plant Battery Cars at U. S. Steel Canada, Hamilton Works
    Boric, Thomas
    La Bruna, Edgardo
    Marsonet, Fernando
    AISTECH 2013: PROCEEDINGS OF THE IRON & STEEL TECHNOLOGY CONFERENCE, VOLS I AND II, 2013, : 329 - 333
  • [4] U. S. stell commissions C battery at Clairton coke works
    Iron Steel Technol., 2013, 3 (234-235):
  • [5] 20/20 project at U. S. Steel's Gary works
    Greenwell, Jeffrey V.
    Lajun, Jennifer D.
    Angeles, Olimpio F.
    AISE Steel Technology, 2002, 79 (09): : 35 - 46
  • [6] BAYTOWN REVISITED - U. S. STEEL TEXAS WORKS' UPDATE.
    Labee, Charles J.
    Iron and Steel Engineer, 1978, 55 (03):
  • [7] DEVELOPMENTS IN THE IRON AND STEEL INDUSTRY U. S. AND CANADA - 1978.
    Kotsch, John A.
    Labee, Charles J.
    Schmidt, Robert L.
    Samways, Norman L.
    Iron and Steel Engineer, 1979, 56 (02):
  • [8] DEVELOPMENTS IN THE IRON AND STEEL INDUSTRY U. S. AND CANADA - 1983.
    Labee, Charles J.
    Samways, Norman L.
    1600, (61):
  • [9] DEVELOPMENTS IN THE IRON AND STEEL INDUSTRY U. S. AND CANADA - 1975.
    Kotsch, J.A.
    Labee, C.J.
    Iron and Steel Engineer, 1976, 53 (02):
  • [10] TIN COATING WEIGHT GAGE AT U. S. STEEL'S PITTSBURG WORKS.
    Gibson, John R.
    Iron and Steel Engineer, 1977, 54 (01): : 51 - 56