A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects

被引:11
|
作者
Alajmi, Abdulali Mohammed [1 ]
Memon, Zubair Ahmed [1 ]
机构
[1] Prince Sultan Univ, Coll Engn, Riyadh 11586, Saudi Arabia
来源
SMART CITIES | 2022年 / 5卷 / 04期
关键词
construction industry; delays; Saudi Arabia; cause; effect; IDENTIFICATION; INDUSTRY; SECTOR; ROAD;
D O I
10.3390/smartcities5040075
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Kingdom of Saudi Arabia (KSA) is suffering major delays in construction projects. Because the construction business in Saudi Arabia has changed dramatically over the last three decades, it is crucial to conduct a thorough study into the reasons for delays and to get industry experts on the same page. In this paper, an overview of the construction sector generally and the Saudi Arabian construction industry has been presented. Based on the literature review the major causes, as well as effects of the delays caused in the construction industry, have been identified. Some of the common causes identified are incorrect planning, administration problems, difficulties in financing, lack of experienced staff, and poor communication. It is advised that the major actors in the construction sector employ the proper tactics to implement preventative measures to lessen the consequences when carrying out construction projects.
引用
收藏
页码:1465 / 1487
页数:23
相关论文
共 50 条
  • [31] Exploring the Impacts of Change Orders on Performance of Construction Projects in Saudi Arabia
    Alzara, Majed
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [32] Development of a scale for factors causing delays in infrastructure projects in India
    Edison, J. C.
    Singla, Harish Kumar
    CONSTRUCTION ECONOMICS AND BUILDING, 2020, 20 (01): : 36 - 55
  • [33] Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria
    Ameh, Oko John
    Soyingbe, Aliu Adebayo
    Odusami, Koleola Tunwase
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2010, 15 (02) : 49 - 67
  • [34] Analysing factors affecting delays in Indian construction projects
    Doloi, Hemanta
    Sawhney, Anil
    Iyer, K. C.
    Rentala, Sameer
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (04) : 479 - 489
  • [35] Exploring influential factors in childhood vaccine delays in Riyadh, Saudi Arabia
    Basham, Karam
    Al Mutairi, Faris
    Baw, Bara
    Al Said, Leila
    JOURNAL OF FAMILY MEDICINE AND PRIMARY CARE, 2024, 13 (08) : 3165 - 3172
  • [36] Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach
    Rahman, Ismail Abdul
    Al-Emad, Nashwan
    Nagapan, Sasitharan
    2016 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2016), 2016, 81
  • [37] Significant Factors Affecting the Quality of Housing Infrastructure Project Construction in Saudi Arabia Using PLS-SEM
    Aljarallah, Nasser
    Alsugair, Abdullah M.
    Almohsen, Abdulmohsen S.
    Al-Gahtani, Khalid S.
    SUSTAINABILITY, 2023, 15 (20)
  • [38] Significant factors causing delay in the UAE construction industry
    Faridi, Arshi Shakeel
    El-Sayegh, Sameh Monir
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (11) : 1167 - 1176
  • [39] Significant Factors Causing Delay in the Cambodian Construction Industry
    Tahmasebinia, Faham
    Song, Vicheth
    SUSTAINABILITY, 2022, 14 (06)
  • [40] Causes of delays in road construction projects: a systematic review
    Kumar, Modish
    Kumari, Santosh
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025,