Energy use in repairs by cover concrete replacement or silane treatment for extending service life of chloride-exposed concrete structures

被引:0
|
作者
Petcherdchoo, A. [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok, Dept Civil Engn, Fac Engn, Bangkok, Thailand
关键词
MARINE-ENVIRONMENT; DIFFUSION;
D O I
10.1088/1757-899X/369/1/012030
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, the service life of repaired concrete structures under chloride environment is predicted. This prediction is performed by considering the mechanism of chloride ion diffusion using the partial differential equation (PDE) of the Fick's second law. The one-dimensional PDE cannot simply be solved, when concrete structures are cyclically repaired with cover concrete replacement or silane treatment. The difficulty is encountered in solving position-dependent chloride profile and diffusion coefficient after repairs. In order to remedy the difficulty, the finite difference method is used. By virtue of numerical computation, the position-dependent chloride profile can be treated position by position. And, based on the Crank-Nicolson scheme, a proper formulation embedded with position-dependent diffusion coefficient can be derived. By using the aforementioned idea, position-and time-dependent chloride ion concentration profiles for concrete structures with repairs can be calculated and shown, and their service life can be predicted. Moreover, the use of energy in different repair actions is also considered for comparison. From the study, it is found that repairs can control rebar corrosion and/or concrete cracking depending on repair actions.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Service life and global warming potential of chloride exposed concrete with high volumes of fly ash
    Van den Heede, Philip
    De Keersmaecker, Michel
    Elia, Alice
    Adriaens, Annemie
    De Belie, Nele
    CEMENT & CONCRETE COMPOSITES, 2017, 80 : 210 - 223
  • [42] Quantification of the Service Life Extension and Environmental Benefit of Chloride Exposed Self-Healing Concrete
    Van Belleghem, Bjorn
    Van den Heede, Philip
    Van Tittelboom, Kim
    De Belie, Nele
    MATERIALS, 2017, 10 (01)
  • [43] A Review of Chloride Penetration of Recycled Concrete with Enhancement Treatment and Service Life Prediction
    Wang, Yuanzhan
    Liao, Jing
    Zhang, Baohua
    MATERIALS, 2024, 17 (06)
  • [44] Service life of concrete structures considering the effects of temperature and relative humidity on chloride transport
    de Medeiros-Junior, Ronaldo A.
    de Lima, Maryangela G.
    de Medeiros, Marcelo H. F.
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2015, 17 (05) : 1103 - 1119
  • [45] General model for service life analysis of reinforced concrete structures subject to chloride penetration
    Balestra, Carlos Eduardo Tino
    Reichert, Thiago Alessi
    Pansera, Wagner Alessandro
    Savaris, Gustavo
    CONSTRUCTION AND BUILDING MATERIALS, 2021, 305
  • [46] Considerations about the service life prediction of reinforced concrete structures inserted in chloride environments
    Andrade J.J.O.
    Possan E.
    Dal Molin D.C.C.
    Journal of Building Pathology and Rehabilitation, 2017, 2 (1)
  • [47] Service life of concrete structures considering the effects of temperature and relative humidity on chloride transport
    Ronaldo A. de Medeiros-Junior
    Maryangela G. de Lima
    Marcelo H. F. de Medeiros
    Environment, Development and Sustainability, 2015, 17 : 1103 - 1119
  • [48] EVALUATION OF THE CHLORIDE DIFFUSION COEFFICIENT IN BLENDED CONCRETE AND SERVICE LIFE PREDICTION OF RC STRUCTURES
    Nair, Krishna Gopi
    Rathod, Jashvantkumar Devabhai
    Lad, Sharmi Darshankumar
    Indian Concrete Journal, 2023, 97 (02): : 21 - 36
  • [49] Effective chloride barrier for reinforced concrete structures in order to extend the service-life
    Wittmann, Folker H.
    Advances in Construction Materials 2007, 2007, : 427 - 437
  • [50] The effect of chloride-induced steel corrosion on service life of reinforced concrete structures
    Suwito, C.
    Xi, Y.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2008, 4 (03) : 177 - 192