Bridge performance measures: A fresh perspective

被引:0
|
作者
McCarten, P. S. [1 ]
机构
[1] Dept Transport & Main Rd, Brisbane, Qld, Australia
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridge asset managers have been using performance indicators for many years to report stock and condition. It is recognized the fiscal demands necessary to address stock in poor condition and deficient bridges are significant and considered unsustainable. Recent audits of funding programs have reported there is a lack of transparency and accountability between funding and bridge improvement performance. Bridge managers must therefore:. Implement more robust and focused risk management regimes for prioritizing bridge projects. Improve justification and reporting for projects requiring funding This paper addresses these issues in relation to performance measures and offers a fresh perspective on the performance measures required to report the strategic outcomes expected by the funding agencies and community.
引用
收藏
页码:2092 / 2099
页数:8
相关论文
共 50 条
  • [31] Bridge Decomposition of Restriction Measures
    Tom Alberts
    Hugo Duminil-Copin
    Journal of Statistical Physics, 2010, 140 : 467 - 493
  • [32] Bridge measures small capacitance
    Witt, J
    ELECTRONIC DESIGN, 1996, 44 (23) : 110 - &
  • [33] Bridge Decomposition of Restriction Measures
    Alberts, Tom
    Duminil-Copin, Hugo
    JOURNAL OF STATISTICAL PHYSICS, 2010, 140 (03) : 467 - 493
  • [34] The Bridge of Dieulouard (Meurthe-et-Moselle, France): A Fresh Perspective on Metal Supply Strategies in Carolingian Economy
    Disser, Alexandre
    Dillmann, Philippe
    Leroy, Marc
    Merluzzo, Paul
    Leroy, Stephanie
    ARCHEOSCIENCES-REVUE D ARCHEOMETRIE, 2016, (40) : 149 - 161
  • [35] A literature review on performance measures of logistics management: an intellectual capital perspective
    Wudhikarn, Ratapol
    Chakpitak, Nopasit
    Neubert, Gilles
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (13) : 4490 - 4520
  • [36] EVALUATION WITHOUT BIAS: A METHODOLOGICAL PERSPECTIVE ON PERFORMANCE MEASURES FOR BUSINESS INCUBATORS
    Cheng, Shaoming
    Schaeffer, Peter V.
    REGION ET DEVELOPPEMENT, 2011, (33): : 211 - 225
  • [37] Influence of welding residual stress on fatigue performance of steel bridge deck and treatment measures
    Zheng K.
    Feng X.
    He X.
    Heng J.
    Li L.
    Wang H.
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2024, 56 (03): : 29 - 37
  • [38] Sensitivity of network-level seismic performance measures to the bridge fragility model adopted
    Cavalieri, F.
    Franchin, P.
    Lupoi, A.
    Tesfamariam, S.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 337 - 337
  • [39] Optimum selection of bridge pier retrofit measures considering performance, cost and sustainability criteria
    Stefanidou, Sotiria
    STRUCTURES, 2023, 53 : 98 - 108
  • [40] Paul: In fresh perspective.
    Achtemeier, Paul J.
    THEOLOGICAL STUDIES, 2007, 68 (01) : 211 - 212