Dialysis facility design - Part II: Minimize costly plan changes

被引:0
|
作者
Bower, Steven B. [1 ]
机构
[1] SGA Co, Operat, Bethesda, MD USA
关键词
D O I
暂无
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
During the development and construction of a dialysis clinic, there are decisions that influence the cost, building quality, and completion date of the project. Change orders-changes to the project after bidding and a contractor has been awarded-are often unavoidable. The owner, architect, and contractor, as well as outside agencies, will at times desire to make changes due to whim or necessity. Often, how you approach these changes has a larger impact on cost and schedule than the change itself. This article, the second of four installments focusing on dialysis clinic design, will review many of the issues that arise in successful project initiation and development from concept through construction, and will address several types of challenges that traditionally occur during the process.
引用
收藏
页码:561 / +
页数:4
相关论文
共 50 条
  • [21] Investigation of injury/illness data at a nuclear facility: Part II
    Cournoyer, Michael E.
    Garcia, Vincent E.
    Sandoval, Arnold N.
    George, Gerald L.
    Gubernatis, David C.
    Schreiber, Stephen B.
    JOURNAL OF CHEMICAL HEALTH & SAFETY, 2015, 22 (03): : 11 - 17
  • [22] Career changes in medicine: Part II
    Sox, Harold C.
    ANNALS OF INTERNAL MEDICINE, 2006, 145 (10) : 782 - 783
  • [23] Plastics recycling action plan for Massachusetts. Part II
    Brewer, Gretchen
    Journal of Environmental Systems, 1988, 18 (04): : 299 - 315
  • [24] Sampling dried figs for aflatoxin - Part II: effect of sampling plan design on reducing the risk of misclassifying lots
    Ozer, H.
    Basegmez, H. I. Oktay
    Whitaker, T. B.
    Slate, A. B.
    Giesbrecht, F. G.
    WORLD MYCOTOXIN JOURNAL, 2017, 10 (02) : 99 - 109
  • [25] Systematic Plan of Evaluation Part II: Assessment of Program Outcomes
    Nunn-Ellison, Keri
    Ard, Nell
    Beasley, Sharon F.
    Farmer, Suzette
    TEACHING AND LEARNING IN NURSING, 2018, 13 (02) : 113 - 118
  • [26] Dialysis provider mergers and acquisitions: To sell or not to sell (Part II)
    Hollis, B
    DIALYSIS & TRANSPLANTATION, 1998, 27 (05) : 297 - +
  • [27] 401(k) plan safe harbor rules will, prompt plan design changes
    Baum, SD
    JOURNAL OF TAXATION, 1999, 90 (02): : 80 - +
  • [28] Ergonomics in Healthcare Facility Design, Part 2 Support Areas
    Feiler, Judd L.
    Stichler, Jaynelle F.
    JOURNAL OF NURSING ADMINISTRATION, 2011, 41 (03): : 97 - 99
  • [29] ARCHITECT CLIENT DESIGN COLLABORATION + CAPITALIZING ON COMPUTER TECHNOLOGIES TO AVOID COSTLY CHANGES
    NOVITSKI, BJ
    ARCHITECTURE, 1994, 83 (06): : 131 - 133
  • [30] Rethinking Design Thinking: Part II
    Kimbell, Lucy
    DESIGN AND CULTURE, 2012, 4 (02) : 129 - 148