Research on Railway Tunnel Construction Scheduling Technique Based on LSM

被引:1
|
作者
Liu, Liqiang [1 ]
Liu, Yisheng [1 ]
Tang, Yuanjie [2 ]
Li, Qing [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing, Peoples R China
[2] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing, Peoples R China
关键词
Railway construction; Tunnel project; Linear scheduling method; Scheduling technique;
D O I
10.1007/978-3-642-34651-4_120
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper analyzed the lack of schedule techniques for railway tunnel construction project. According to the linear project characteristics of the railway tunneling, attribute data standard for linear schedule of railway tunnel project have been studied. Moreover, an algorithm of railway tunnel project scheduling based on the Linear scheduling method is given. The algorithm is applied to an example of railway tunnel project to validate its effect.
引用
收藏
页码:895 / 903
页数:9
相关论文
共 50 条
  • [31] Construction Technology of Cangyuan Tunnel of LanYu Railway
    Qi, Su
    Zhang, Ye
    Liu, Shuhao
    Liu, Nian
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1291 - 1295
  • [32] Automatic monitoring technology research on the key progress of construction of railway bridge, subgrade and tunnel
    State Key Laboratory of Track Technolgy of High-speed Railway, China Academy of Railway Sciences, Beijing
    100081, China
    J. Railw. Eng. Soc., 5 (59-64 and 85):
  • [33] New practice of NATM in railway tunnel construction
    Feng, W.
    Xu, M.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (04): : 524 - 526
  • [34] Risk Assessment of Railway Tunnel Construction Based on Grey Fuzzy Linguistic Theory
    Wang, Peng
    Wei, Qiang
    Wang, Jingchun
    Zhao, Guotang
    Journal of Railway Engineering Society, 2023, 39 (11) : 106 - 112
  • [35] Research on Invert Heave Control Technique of High-speed Railway Tunnel in Mudstone
    Liang, Qingguo
    Zhao, Tao
    Jia, Liang
    He, Wenmin
    Su, Xiaojian
    Journal of Railway Engineering Society, 2024, 41 (05) : 46 - 51
  • [36] Research on Tunnel Construction Quality Based on Visualization Management
    Li, Qian
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 3192 - 3195
  • [37] A Nonlinear Optimization Technique of Tunnel Construction Based on DE and LSSVM
    Xing Jun
    Jiang Annan
    Wen Zhiwu
    Qiu Jingping
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [38] Research on construction optimization of shallow buried large section railway tunnel crossing pebble soil
    Yang, Yun
    Huang, Jianling
    Wan, Binghong
    Liang, Ruijun
    Wei, Xiaojiang
    Cai, Xi
    Journal of Railway Science and Engineering, 2021, 18 (05) : 1240 - 1247
  • [39] Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario
    Wei, Jianying
    Liu, Yuming
    Lu, Xiaochun
    Zhao, Rong
    Wang, Gan
    SYSTEMS, 2025, 13 (03):
  • [40] Research on Geometry Modeling Technique of Tunnel Based on Creator
    Miao, Baoliang
    Jin, Hailiang
    Wei, Zhanying
    Jia, Lu
    Li, Yuehua
    Zheng, Yanhui
    2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC), 2011, : 4473 - 4475