Research on Railway Tunnel Construction Scheduling Technique Based on LSM

被引:1
|
作者
Liu, Liqiang [1 ]
Liu, Yisheng [1 ]
Tang, Yuanjie [2 ]
Li, Qing [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing, Peoples R China
[2] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing, Peoples R China
关键词
Railway construction; Tunnel project; Linear scheduling method; Scheduling technique;
D O I
10.1007/978-3-642-34651-4_120
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper analyzed the lack of schedule techniques for railway tunnel construction project. According to the linear project characteristics of the railway tunneling, attribute data standard for linear schedule of railway tunnel project have been studied. Moreover, an algorithm of railway tunnel project scheduling based on the Linear scheduling method is given. The algorithm is applied to an example of railway tunnel project to validate its effect.
引用
收藏
页码:895 / 903
页数:9
相关论文
共 50 条
  • [1] Study on Duration Calculate model of Railway construction based on LSM
    Liu, Liqiang
    Liu, Yisheng
    Tang, Yuanjie
    2015 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS), 2015,
  • [2] Research on construction Technology of Railway tunnel soft rock section based on numerical simulation
    Bo, Wang
    2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 530 - 532
  • [3] Research on the Difficulties and Countermeasures of TBM Tunnel Construction in Plateau Railway
    Li, Zhijun
    Hong, Kairong
    Chen, Qiao
    Niu, Tongtong
    Zhou, Yi
    Yu, Jingbo
    Journal of Railway Engineering Society, 2022, 39 (09) : 70 - 78
  • [4] APPLICATION OF THE CRITICAL CHAIN TECHNIQUE TO THE RAILWAY TUNNEL PROJECT SCHEDULING RISK CONTROLLING
    Gu, Weihong
    Zhao, Ran
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 773 - 777
  • [5] Tunnel construction adjacent to existing railway tunnel
    Fuji, S
    Kon, M
    Kaneko, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 1133 - 1138
  • [6] Research and discussion on several key issues of safety construction of the railway tunnel
    Zhang, M.-Q., 1600, Editorial Department of Journal of Railway Engineering Society, China (30):
  • [7] Research on construction control technology for blast in tunnel crossing existing railway
    Geotechnical and Structural Engineering Research Institute, Shandong University, Jinan 250061, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (3596-3600):
  • [8] Construction control technique for high geostress tunnel in Chongqing-Guizhou railway
    Chongqing-Guizhou Railway Co. Ltd, Chongqing
    400014, China
    不详
    401121, China
    J. Railw. Eng. Soc., 11 (93-97):
  • [9] Construction Cost Prediction of Main Tunnel in Railway Tunnel Based on Support Vector Machine
    Liu, Shaofei
    Hou, Dashan
    Journal of Railway Engineering Society, 2022, 39 (05) : 108 - 113
  • [10] Storebaelt eastern railway tunnel: Construction
    Biggart, AR
    Sternath, R
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1996, 114 : 20 - 39