Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems

被引:38
|
作者
Tung, LF [1 ]
Lin, L [1 ]
Nagi, R [1 ]
机构
[1] SUNY Buffalo, Dept Ind Engn, Buffalo, NY 14260 USA
关键词
flexible manufacturing systems; hierarchical scheduling; multiple objectives;
D O I
10.1023/A:1008183330452
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a hierarchical approach to scheduling flexible manufacturing systems (FMSs) that pursues multiple performance objectives and considers the process flexibility of incorporating alternative process plans and resources for the required operations. The scheduling problem is solved at two levels: the shop level and the manufacturing system level. The shop level controller employs a combined priority index developed in this research to rank shop production orders in meeting multiple scheduling objectives. To overcome dimensional complexity and keep a low level of work-in-process inventory, the shop controller first selects up to three production orders with the highest ranking as candidates and generates all possible release sequences for them, with or without multitasking. These sequences are conveyed to the manufacturing system controller, who then performs detailed scheduling of the machines in the FMS using a fixed priority heuristic for routing parts of multiple types while considering alternative process plans and resources for the operations. The FMS controller provides feedback to the shop controller with a set of suggested detailed schedules and projected order completion times. On receiving these results, the shop controller further evaluates each candidate schedule using a multiple-objective function and selects the best schedule for execution. This allows multiple performance objectives of an FMS to be achieved by the integrated hierarchical scheduling approach.
引用
收藏
页码:379 / 409
页数:31
相关论文
共 50 条
  • [21] MULTIPLE-OBJECTIVE OPTIMIZATION IN WATER-RESOURCE SYSTEMS
    VEMURI, V
    WATER RESOURCES RESEARCH, 1974, 10 (01) : 44 - 48
  • [22] THE EFFECTIVENESS OF SUPERVISORY CONTROL STRATEGIES IN SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    DUNKLER, O
    MITCHELL, CM
    GOVINDARAJ, T
    AMMONS, JC
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1988, 18 (02): : 223 - 237
  • [23] SCHEDULING AND CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - A CRITICAL-REVIEW
    BASNET, C
    MIZE, JH
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (06) : 340 - 355
  • [24] PRODUCTION SCHEDULING AND OPERATIONAL CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS.
    Bonfioli, M.
    Garetti, M.
    Pozzetti, A.
    1600, (03):
  • [25] MASTER PRODUCTION SCHEDULING - A MULTIPLE-OBJECTIVE LINEAR-PROGRAMMING APPROACH
    GONZALEZ, JJ
    REEVES, GR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1983, 21 (04) : 553 - 562
  • [26] Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems
    Gagné, C
    Gravel, M
    Price, WL
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (06) : 687 - 698
  • [27] Is multiple-objective model-predictive control "optimal"?
    Hackl, C. M.
    Larcher, F.
    Doelinger, A.
    Kennel, R. M.
    2013 IEEE INTERNATIONAL SYMPOSIUM ON SENSORLESS CONTROL FOR ELECTRICAL DRIVES AND PREDICTIVE CONTROL OF ELECTRICAL DRIVES AND POWER ELECTRONICS (SLED/PRECEDE), 2013,
  • [28] A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS
    CHOI, JG
    HITOMI, K
    ECON, P
    ECON, PE
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 247 - 255
  • [29] Multiple-objective optimal control of hybrid electric vehicle
    Jun, Yan
    MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 1659 - 1664
  • [30] AN APPROACH TO HIERARCHICAL PLANNING AND SCHEDULING FOR FLEXIBLE MANUFACTURING CELLS
    JUAN, ZL
    QI, WN
    SONG, XJ
    IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 1 : 265 - 272