SHORT TUNNELS = HIGH RISK?: PIPELINE CONSTRUCTION INVOLVING OPEN-CUT AND TUNNEL SEGMENTS

被引:0
|
作者
Gilbert, Michael
Schultz, Michael
机构
来源
2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS | 2009年
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In the world of tunneling the glamour is in the large diameter, long tunnels, but perhaps the number of projects for small diameter and short length tunnels are greater and generally have higher risk factors. Reasons for these higher risks include both the "boiler plate" contract provisions used on these types of contracts, the technical specifications related to the tunnel work (versus the pipeline construction), the bid practices including measurement and payment and the construction. This paper reviews and comments on some of the key issues the authors have observed in recent major pipeline projects that involve a small percentage of tunneling footage of the total contract.
引用
收藏
页码:881 / 891
页数:11
相关论文
共 50 条
  • [1] Study on construction control scheme of new open-cut tunnel over existing metro tunnel
    Jiang, Huachun
    Huang, Wei
    Journal of Railway Science and Engineering, 2021, 18 (05) : 1231 - 1239
  • [2] Remolding and Heavy Metal Leaching Properties of Solidified Soil in Open-cut Tunnel Construction
    Chen L.
    Chen Y.-H.
    Li D.-S.
    Chen G.
    Min F.-L.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2023, 36 (11): : 335 - 344
  • [3] Optimization on the opening rate of the open-cut tunnel portal
    Niu J.
    Liang X.
    Zhou D.
    Liu T.
    Liang, Xifeng (gszxlxf@163.com), 1600, Harbin Institute of Technology (49): : 175 - 180and188
  • [4] Model Test Study on Metro Shield Construction Undercrossing Existing Open-Cut Tunnel
    Liu Y.
    Cao Y.
    Wu X.
    Fan H.
    Zhou Y.
    Song Y.
    Lin J.
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (01): : 110 - 121
  • [5] Dynamic Analysis of Open-Cut Tunnels Under Rockfall Impact
    Zhang, Yanhuan
    Wang, Jing
    Li, Liping
    Ba, Xingzhi
    Chen, Diyang
    Fang, Zhongdong
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2025, 43 (01)
  • [6] The Effect of Foundation Pit Excavations on Adjacent Open-Cut Tunnels for High-Speed Railways
    Zhou, Zhong
    Wang, Xiang-Can
    Yang, Hao
    Zhang, Qi-Fang
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 234 - 242
  • [7] Calculation method and influencing factors for earth pressure of high fill open-cut tunnel
    Li S.
    Ma L.
    Wang Q.
    Li J.
    Li W.
    Zhang Y.
    Zhongguo Tiedao Kexue/China Railway Science, 2016, 37 (05): : 41 - 49
  • [8] Physiological response of rainbow trout to sediment released during open-cut pipeline water crossing construction
    Reid, SM
    Isaac, G
    Metikosh, S
    Evans, J
    WATER QUALITY RESEARCH JOURNAL OF CANADA, 2003, 38 (03): : 473 - 481
  • [9] On the failure mechanism and reinforcement techniques for open-cut sections of high-speed railway tunnels
    Xu, Changmao
    Wu, Li
    Wu, Shuanglan
    Deng, Zongwei
    Li, Bo
    Modern Tunnelling Technology, 2015, 52 (06) : 126 - 134
  • [10] Application of improved AHP in risk identification during open-cut construction of a subway station
    Li, Feng-Wei
    Du, Xiu-Li
    Zhang, Ming-Ju
    Gao, Yun-Hao
    Beijing Gongye Daxue Xuebao/Journal of Beijing University of Technology, 2012, 38 (02): : 167 - 172