Analysis of operability envelopes for subsea production tree installation

被引:1
|
作者
Wang, Fei [1 ]
Chen, Neng [1 ]
Deng, Xiang [2 ]
Ji, Xiaoke [3 ]
Yang, Qianlin [4 ]
机构
[1] Southwest Petr Univ, Sch Mechatron Engn, Chengdu, Peoples R China
[2] Southwest Petr Univ, Sch Petr Engn, Chengdu, Peoples R China
[3] China Natl Petr Corp, Changqing Oilfield Co, Xian, Peoples R China
[4] Sichuan Coll Architectural Technol, Dept Railway Engn, Deyang, Peoples R China
关键词
MARINE RISER;
D O I
10.23967/j.rimni.2020.10.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The article presents a mathematical model to investigate the operability envelopes for subsea production tress (SPT) installation using drill pipe. The finite differential method was used to solve the established governing equations in which the ocean conditions were considered. Based on the evaluations of the ocean wave, ocean current, water depth, specification of drill pipe and SPT weight that might dominate the mechanical behaviors of the pipe, the operability envelopes with permissible ocean conditions for SPT installation were obtained. The results indicate that changes of depths in deep water and SPT weight have few effects on the operation conditions and it would be better to choose smaller pipe to obtain larger permissible ocean conditions during SPT installation.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] A Possibility of Active Controlled Installation for Deep Water Subsea Production Modules
    Watanabe, Keisuke
    PROCEEDINGS OF THE 2012 FIFTH INTERNATIONAL CONFERENCE ON EMERGING TRENDS IN ENGINEERING AND TECHNOLOGY (ICETET 2012), 2012, : 163 - 166
  • [22] A mathematical model of virtual simulation for deepwater installation of subsea production facilities
    Zhang, Xinhu
    Duan, Menglan
    Mao, Dongfeng
    Yu, Yang
    Yu, Jianxing
    Wang, Yi
    SHIPS AND OFFSHORE STRUCTURES, 2017, 12 (02) : 182 - 195
  • [23] A Preview of the Subsea Christmas Tree Installation Procedure (vol 60, pg 1289, 2024)
    Xu, Xinjing
    Ji, Jinfeng
    Li, Li
    Xu, Xiang
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2025, 60 (06) : 1700 - 1700
  • [24] EXPERIMENTAL SET-UP FOR ANALYSIS OF SUBSEA EQUIPMENT INSTALLATION
    de Mello, Pedro C.
    Rateiro, Felipe
    Fujarra, Andre L. C.
    Oshiro, Anderson T.
    Neves, Cassiano R.
    dos Santos, Melquisedec F.
    Eduardo, Tannuri A.
    OMAE2011: PROCEEDINGS OF THE ASME 30TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, VOL 6: OCEAN ENGINEERING, 2011, : 763 - +
  • [25] Operability Analysis of New Wind Turbine Installation Vessels in China Seas
    Pan, Qi
    Li, Xingqun
    Xu, Lixin
    Ship Building of China, 2021, 62 (01) : 225 - 233
  • [26] Factors influencing the installation and maintenance of subsea petroleum production equipment A case study
    Moreno-Trejo, Jorge
    Kumar, Rajesh
    Markeset, Tore
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2012, 18 (04) : 454 - +
  • [27] SUBSEA TEST TREE ALLOWED EARLY PRODUCTION OF AN OIL DISCOVERY
    ARMANDO, S
    MACHTALERE, W
    WORLD OIL, 1981, 193 (06) : 125 - &
  • [28] The Application of ROV for the Subsea Christmas tree Installation in the LiWan3-1 Deepwater Oilfield
    Zhang, Jingan
    Zheng, Hui
    Bu, Jiangen
    Li, Chenggang
    2013 INTERNATIONAL CONFERENCE ON PROCESS EQUIPMENT, MECHATRONICS ENGINEERING AND MATERIAL SCIENCE, 2013, 331 : 39 - +
  • [29] Settle subsea pipeline installation completed
    不详
    PIPELINE & GAS JOURNAL, 1999, 226 (10) : 10 - 10
  • [30] PROBABILISTIC ANALYSIS OF TRANSIENT EVENTS BY AN EVENT TREE DIRECTLY EXTRACTED FROM OPERABILITY ANALYSIS - EVALUATION OF ACCIDENTAL RELEASES OF GAS FROM A PRESSURE-REGULATING INSTALLATION
    PICCININI, N
    SCARRONE, M
    CIARAMBINO, I
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 1994, 7 (01) : 23 - 32