Design of the Risk Evaluation indicator System and Weight of Special Equipment User

被引:0
|
作者
Hao, Suli [1 ]
Chu, Haiyan [1 ]
机构
[1] China Univ Min & Technol Beijing, Sch Management, Beijing, Peoples R China
关键词
the special equipments user; equipments risk; the risk evaluation; indicator system; the weight design;
D O I
10.4028/www.scientific.net/AMR.753-755.2935
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The weight is description of the risk intensity. The paper using special equipment user as object to researched the equipment risk evaluation indicator system and weights. Firstly, according to the nature of enterprises, the special equipment user has been divided into four categories: the user of passenger ropeway and large recreational facilities; the user of pressure equipments; the manufacture which the pressure equipments are not the main production equipments; the user of non manufacture which are not the main production equipments. Secondly the AHP has been applied to calculate the basic weight of special equipment user risk evaluation indicator system, and the weight index has been applied to adjustment the weights. Finally the SINOFEC CATALYST company has been applied to verify the model.
引用
收藏
页码:2935 / 2940
页数:6
相关论文
共 50 条
  • [41] Equipment & System Design for EMC
    Carlton, Ross
    2017 IEEE INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY & SIGNAL/POWER INTEGRITY (EMCSI), 2017,
  • [42] Assisted Driving of a Mobile Remote Presence System: System Design and Controlled User Evaluation
    Takayama, Leila
    Marder-Eppstein, Eitan
    Harris, Helen
    Beer, Jenay M.
    2011 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2011, : 1883 - 1889
  • [43] Design of an Indicator System for the Evaluation and Selection of Applications for People With Autistic Spectrum Disorder
    del Pilar Gallardo-Montes, Carmen
    Jesus Caurcel-Cara, Maria
    Rodriguez-Fuentes, Antonio
    REVISTA ELECTRONICA EDUCARE, 2021, 25 (03): : 1 - 24
  • [44] Research on the Indicator System and Risk Evaluation Model of the BOT Projects Bidding Program
    Yao, Ligen
    Lai, Zhilei
    2008 IEEE INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING WORKSHOP PROCEEDINGS, VOLS 1 AND 2, 2008, : 1002 - 1005
  • [45] Research on the Indicator System and Risk Evaluation Model of the BOT Projects Bidding Program
    Yao, Ligen
    Lai, Zhilei
    2008 IEEE INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING WORKSHOP PROCEEDINGS, VOLS 1 AND 2, 2008, : 414 - 417
  • [46] Determination of Coal Mine Safety Risk System Indicator Weight Based on BP Neural Network
    Wang Xiangyao
    Chen Mingli
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 239 - 244
  • [47] DESIGN FOR THE ELDERLY - USER-BASED EVALUATION STUDIES INVOLVING ELDERLY USERS WITH SPECIAL NEEDS
    SANDHU, J
    APPLIED ERGONOMICS, 1993, 24 (01) : 30 - 34
  • [48] Evaluation of user friendliness in the design process of user interfaces
    de, Waal, B.M.E.
    van der Heiden, G.H.
    Proceedings of the IFIP TC 8/WG 8.1 Working Conference, 1990,
  • [49] Design optimization of a special mounting system - Floating raft for ship power equipment vibration isolation
    Yu, Wang
    Hua, HongXing
    Shen, Rongying
    American Society of Mechanical Engineers, Dynamic Systems and Control Division (Publication) DSC, 2000, 68 : 233 - 239
  • [50] Design and Realization of Testing and Evaluation System for Recycling Equipment of Type of Electronic Device
    Xue, Xuedong
    Liu, Dongyan
    Liu, RongLi
    Yang, Bo
    Wang, HanBing
    2015 8TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 1, 2015, : 350 - 353