Time-variant reliability assessment of FPSO hull girder with long cracks

被引:0
|
作者
Ayala-Uraga, Efren [1 ]
Moan, Torgeir [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Marine Technol, N-7491 Trondheim, Norway
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An efficient time-variant reliability formulation for the safety assessment of an aging Floating Production Storage and Offloading (FPSO) vessels with the presence of through-thickness cracks (i.e. long cracks), is presented in this paper. Often in ship structures, cracks are detected by means of close visual inspection when they have already propagated through the thickness. The propagation of long cracks in stiffened panels is therefore considered, as they may be present in critical details of the deck and/or bottom plating of the vessel. The mean stress effect due to the continuously varying still-water loading as well as residual stresses is explicitly accounted for in the crack growth calculation. An analytical model is established for determining the equivalent long-term stress range. Although it has been found that stiffened panels are tolerant to fatigue cracking, the probability of brittle fracture of an aging hull structure becomes more relevant with the presence of long cracks. The continuously varying still-water load effects due to the operational nature of FPSOs introduce additional uncertainties in the estimation of fatigue damage as well as in the likelihood of fracture failure mode. These uncertainties are accordingly considered in the analyses.
引用
收藏
页码:87 / 96
页数:10
相关论文
共 50 条
  • [31] Importance Sampling for Time-Variant Reliability Analysis
    Wang, Jian
    Cao, Runan
    Sun, Zhili
    IEEE ACCESS, 2021, 9 : 20933 - 20941
  • [32] Bridge Time-variant Reliability Assessment considering Resistance Deterioration and Load Change
    Wu, Xun
    Zhang, Zhichao
    Li, Jie
    Yi, Xianshui
    Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 929 - 932
  • [33] Analysis of the time variant reliability of ship hull
    Huang, Wen-Bo
    Zhang, Sheng-Kun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2003, 37 (08): : 1151 - 1154
  • [34] Time-Variant Travel Time Distributions and Reliability Metrics and Their Utility in Reliability Assessments
    Alvarez, Patricio
    Hadi, Mohammed
    TRANSPORTATION RESEARCH RECORD, 2012, (2315) : 81 - 88
  • [35] On accuracy of different approaches to time-variant structural reliability
    Sykora, M.
    RISK, RELIABILITY AND SOCIETAL SAFETY, VOLS 1-3: VOL 1: SPECIALISATION TOPICS; VOL 2: THEMATIC TOPICS; VOL 3: APPLICATIONS TOPICS, 2007, : 1801 - 1809
  • [36] A Multilevel Simulation Method for Time-Variant Reliability Analysis
    Wang, Jian
    Gao, Xiang
    Sun, Zhili
    SUSTAINABILITY, 2021, 13 (07)
  • [37] Time-variant finite element reliability for performance degradation assessment of concrete gravity dam
    Yu, Chengyi
    2015 FIFTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC), 2015, : 73 - 76
  • [38] An improved TRPD method for time-variant reliability analysis
    Jiang, C.
    Wei, X. P.
    Wu, B.
    Huang, Z. L.
    STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2018, 58 (05) : 1935 - 1946
  • [39] Explicit Model of Outcrossing Rate for Time-Variant Reliability
    Li, Xiang-Wei
    Zhao, Yan-Gang
    Zhang, Xuan-Yi
    Lu, Zhao-Hui
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2022, 8 (01)