共 50 条
- [43] FMEA method based on fuzzy theory and D-S evidence theory Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (11): : 2662 - 2668
- [44] Construction Project Risk Assessment Using Combined Fuzzy and FMEA PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 232 - 237
- [49] HSE risk prioritization of molybdenum operation process using extended FMEA approach based on Fuzzy BWM and Z-WASPAS Journal of Intelligent and Fuzzy Systems, 2020, 38 (04): : 5157 - 5173
- [50] The new hybrid value at risk approach based on the extreme value theory ESTUDIOS DE ECONOMIA, 2016, 43 (01): : 29 - 52