A grammatical optimization approach for integrated process planning and scheduling

被引:32
|
作者
Baykasoglu, Adil [1 ]
Ozbakir, Lale [2 ]
机构
[1] Univ Gaziantep, Dept Ind Engn, Gaziantep, Turkey
[2] Erciyes Univ, Dept Ind Engn, Kayseri, Turkey
关键词
Process planning; Scheduling; Tabu Search; Grammars; THE-ART SURVEY; JOB-SHOP; MANUFACTURING SYSTEMS; GENETIC ALGORITHMS; PROCESS PLANS; TABU SEARCH; TUTORIAL; MODEL;
D O I
10.1007/s10845-008-0223-0
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Rapid developments in computerized manufacturing environments and increasing overlapping in the capability of manufacturing resources provoked integration of many manufacturing functions including process planning scheduling. Several approaches have been developed in the literature in order to integrate process planning and scheduling. In this paper a novel approach which makes use of grammatical representation of generic process plans is used within a multiple objective tabu search framework in order to integrate process planning and scheduling effectively. Detailed explanations along with an example problem are presented in the paper. Proposed approach is tested on literature problems and also hypothetically generated flexible job shop scheduling problems with alternative process plans to analyze its performance and efficiency.
引用
收藏
页码:211 / 221
页数:11
相关论文
共 50 条
  • [41] Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
    Li, Xinyu
    Gao, Liang
    Shao, Xinyu
    Zhang, Chaoyong
    Wang, Cuiyu
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (04) : 656 - 667
  • [42] A Genetic Programming-Based Iterative Approach for the Integrated Process Planning and Scheduling Problem
    Zhu, Xuedong
    Guo, Xinxing
    Wang, Weihao
    Wu, Jianguo
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 2566 - 2580
  • [43] A tool-based approach to integrated computer-aided process planning and scheduling
    Hall, DM
    Zhang, P
    ADVANCES IN MANUFACTURING TECHNOLOGY - XIII, 1999, : 185 - 189
  • [44] Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
    Moradi, Esmaeel
    Ayough, Ashkan
    Zandieh, Mostafa
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2019, 12 (02) : 133 - 159
  • [45] A graph-based constraint programming approach for the integrated process planning and scheduling problem
    Zhang, Luping
    Yu, Chunxia
    Wong, T. N.
    COMPUTERS & OPERATIONS RESEARCH, 2021, 131
  • [46] Integrated optimization of production planning and scheduling for flexible jobshop
    Dong, Qiaoying
    Lu, Jiansha
    Gui, Yuankun
    International Review on Computers and Software, 2012, 7 (03) : 1273 - 1282
  • [47] Integrated Planning, Scheduling, and Dynamic Optimization for Continuous Processes
    Shi, Hanyu
    Chu, Yunfei
    You, Fengqi
    2014 IEEE 53RD ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2014, : 388 - 393
  • [48] Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
    Muhammad Farhan AUSAF
    Liang GAO
    Xinyu LI
    Frontiers of Mechanical Engineering, 2015, 10 (04) : 392 - 404
  • [49] Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
    Ausaf M.F.
    Gao L.
    Li X.
    Frontiers of Mechanical Engineering, 2015, 10 (4) : 392 - 404
  • [50] An integrated approach for UTRAN planning and optimization
    Zhang, J
    Guo, L
    Wu, JY
    VTC2004-SPRING: 2004 IEEE 59TH VEHICULAR TECHNOLOGY CONFERENCE, VOLS 1-5, PROCEEDINGS, 2004, : 2360 - 2364