Optimal economic dispatch for wind farm considering uncertainty of wind power

被引:1
|
作者
Zhang, Xin [1 ]
Ding, Jiale [1 ]
Lin, Kai [2 ]
机构
[1] Sch Shanghai DianJi Univ, Shanghai, Peoples R China
[2] State Grid Wenzhou Elect Power Supply Co, Wenzhou, Zhejiang, Peoples R China
关键词
D O I
10.1088/1742-6596/1176/6/062003
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Because of the wind power generation characteristics, the wind turbine's dispatch model is based on wind power prediction. Even though the current average forecast error of ultra-short-term wind power prediction is already low, there are still some errors and uncertainties. Therefore, the scenario analysis method is used to estimate the forecast error. The deterministic modeling is realized by using the spare amount. In order to plan the operating cost of the wind farm reasonably, the scenario analysis method and the possible spare cost are combined with the idle cost of the unit to establish an economic dispatch model within the wind farm. The example analysis shows that the model is feasible.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Economic Dispatch of Wind Farm Cluster Integrated Power System Considering High Energy Load
    Zhang, Xiaoying
    Liao, Shun
    Wang, Kun
    Wang, Xiaolan
    Chen, Wei
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC2019), 2020, 582 : 23 - 32
  • [22] Optimal power dispatch in wind farm with life extension of wind turbine blades as target
    Zhang, Jinhua
    Liu, Yongqian
    Tian, De
    Gu, Bo
    Wang, Ningbo
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2013, 34 (11): : 1978 - 1985
  • [23] Optimal power dispatch in wind farm with life extension of wind turbine blades as target
    Zhang, Jinhua
    Liu, Yongqian
    Tian, De
    Chen, Gouhong
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2013, 5 (03)
  • [24] The Active Power and Reactive Power Dispatch Plan of DFIG Based Wind Farm Considering Wind Power Curtailment
    Wang, Zengping
    Zhang, Lefeng
    Li, Guohuang
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2015, 8 (03) : 553 - 560
  • [25] The Active Power and Reactive Power Dispatch Plan of DFIG Based Wind Farm Considering Wind Power Curtailment
    Zengping Wang
    Lefeng Zhang
    Guohuang Li
    International Journal of Computational Intelligence Systems, 2015, 8 : 553 - 560
  • [26] Short-term optimal dispatch considering uncertainty cost for power system with wind farms
    Qu, Zhengwei
    Wang, Jingbo
    Zhang, Kun
    Wang, Yunjing
    Zheng, Lei
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2016, 36 (04): : 137 - 144
  • [27] Bi-level robust dynamic economic emission dispatch considering wind power uncertainty
    Hu, Zhijian
    Zhang, Menglin
    Wang, Xiaofei
    Li, Chen
    Hu, Mengyue
    ELECTRIC POWER SYSTEMS RESEARCH, 2016, 135 : 35 - 47
  • [28] Adjustable and distributionally robust chance-constrained economic dispatch considering wind power uncertainty
    Fang, Xin
    Hodge, Bri-mathias
    Li, Fangxing
    Du, Ershun
    Kang, Chongqing
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2019, 7 (03) : 658 - 664
  • [29] Adjustable and distributionally robust chance-constrained economic dispatch considering wind power uncertainty
    Xin FANG
    Bri-Mathias HODGE
    Fangxing LI
    Ershun DU
    Chongqing KANG
    Journal of Modern Power Systems and Clean Energy, 2019, 7 (03) : 658 - 664
  • [30] Dynamic Environmental Economic Dispatch Considering the Uncertainty and Correlation of Photovoltaic-Wind Joint Power
    Ru, Yi
    Wang, Ying
    Mao, Weijun
    Zheng, Di
    Fang, Wenqian
    ENERGIES, 2024, 17 (24)