Model of a Maturity Capsule in Managing IT Projects

被引:0
|
作者
Kowalczuk, Zdzislaw [1 ]
Orlowski, Cezary [2 ]
机构
[1] Gdansk Univ Technol, Fac Elect Telecommun & Informat, PL-80233 Gdansk, Poland
[2] IBM Ctr Adv Studies Campus, Gdansk, Poland
关键词
IT management; method selection; Client; verification processes; decision-making support; enterprise architecture; maturity; information technology; project negentropy; provider; software environment; supplier; technology selection; data processing; mathematical modeling;
D O I
10.1080/01969722.2014.874809
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The main purpose of this article is to present a report on the development of a model of information technology management (MITM). This model is an answer to the need to support decision making in the selection of methods and information technologies. This article presents a multisequential model (MSM) of technology selection and a model for initial processing procedures (IPP) necessary for the MITM model. The presentation of the construction stages of both models is followed by a discussion on their verification processes in an environment of enterprise architecture development. Aggregated (within the process of IPP) variables are applied, such as the maturity of the client (C) and the provider/supplier (S), as well as the project negentropy (P), which is a measure of the project development state. Next, the concept of an integrated maturity capsule (C-S-P) is introduced. The work concludes with the authors' observations, concerning mainly the purposefulness of using decision-making models in the management of information technology projects but also on the applicability of the methods of modeling such projects.
引用
收藏
页码:123 / 135
页数:13
相关论文
共 50 条
  • [21] Harmonization simulation model for managing several stochastic projects
    Menipaz, E
    Ben-Yair, A
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 61 (01) : 61 - 66
  • [22] Managing Projects
    Ahlberg, Pamela
    Lab Manager, 2012, 7 (05):
  • [23] A queueing model for managing small projects under uncertainties
    Bai, Jiaru
    So, Kut C.
    Tang, Christopher
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 253 (03) : 777 - 790
  • [24] A Maturity Model for Measuring the Capability of Project Teams in Managing Changes
    Sun, Ming
    Vidalakis, Christos
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 136 - 142
  • [25] Managing the broken capsule
    Wu, Michael C.
    Bhandari, Anuja
    CURRENT OPINION IN OPHTHALMOLOGY, 2008, 19 (01) : 36 - 40
  • [26] EVALUATING THE HEALTH AND SAFETY MATURITY OF SUSTAINABLE BUILDING PROJECTS USING A SUSTAINABLE HEALTH AND SAFETY MATURITY MODEL
    Orogun, Bezalel
    Issa, Mohamed H.
    JOURNAL OF GREEN BUILDING, 2023, 18 (04): : 57 - 78
  • [27] Failure, success, and maturity in projects
    Ahiable, A
    Dalcher, D
    2005 IEEE INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE, VOLS 1 AND 2, 2005, : 793 - 797
  • [28] MANAGING DATA FLOWS IN INFRASTRUCTURE PROJECTS - THE LIFECYCLE PROCESS MODEL
    Halttula, Heikki
    Haapasalo, Harri
    Silvola, Risto
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2020, 25 : 193 - 211
  • [29] THE USE OF CONCEPTUAL BUSINESS MODEL IN MANAGING INFORMATION TECHNOLOGY PROJECTS
    Siqueira, Luciene Diana
    Crispim, Sergio Feliciano
    Gaspa, Marcos Antonio
    SISTEMAS & GESTAO, 2015, 10 (04): : 575 - 586
  • [30] A computerized model for managing environmental impacts in residential construction projects
    Gangolells, M.
    Casals, M.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2012, : 201 - 209