Fuzzy QFD for Process Synergy Management in Construction Projects

被引:0
|
作者
Feng Ya-hong [1 ]
机构
[1] Xian Univ Sci & Technol, Coll Management, Xian 710054, Peoples R China
关键词
project management; fuzzy QFD; construction project development; customer satisfaction; REQUIREMENTS; RANKING; QUALITY; HOUSE;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Construction project development is a complex process that involves various parties to implement various process stages. It is fragmented and usually undergoes several rounds of design evolution, and as a result the basic and original customer's requirements may be easily sidetracked or may deviate from the client's objectives. Quality function deployment (QFD) is a systematic methodology that can be used to keep track of customers' requirements. The aim of this paper is to propose an original approach for the process synergy management of construction project. The approach is based on the QFD, and fuzzy logic is also adopted to deal with the ill-defined nature of the qualitative linguistic judgments required in the proposed house of quality (HOQ). Specifically, the paper addresses the issue of how to deploy the HOQ to effectively and efficiently improve construction project development processes and thus customer satisfaction.
引用
收藏
页码:1691 / 1696
页数:6
相关论文
共 50 条
  • [42] The Whole Process Cost Management for Construction Projects in Higher Vocational Colleges of China
    Liu, Chunming
    Zhang, Qi
    Liu, Liang
    Peng, Hongtao
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012), 2012, 23
  • [43] FUZZY MODELING OF RISKS IN INVESTMENT AND CONSTRUCTION PROJECTS
    Glushenko, Sergey A.
    Doljenko, Alexey I.
    BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2015, 32 (02): : 48 - 58
  • [44] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [45] A Framework for Coordination Process into Construction Projects
    Alaloul, Wesam S.
    Liew, Mohd Shahir
    Zawawi, Noor Amila B. W. A.
    4TH INTERNATIONAL BUILDING CONTROL CONFERENCE 2016 (IBCC 2016), 2016, 66
  • [46] The Characteristics of Coordination Process in Construction Projects
    Alaloul, Wesam Salah
    Liew, Mohd Shahir
    Zawawi, Noor Amila Wan Abdullah
    2ND INTERNATIONAL SYMPOSIUM ISTMET 2015 TECHNOLOGY MANAGEMENT & EMERGING TECHNOLOGIES, 2015,
  • [47] Construction and demolition waste management: Fuzzy Analytic Hierarchy Process approach
    Khoshand, Afshin
    Khanlari, Kimia
    Abbasianjahromi, Hamidreza
    Zoghi, Milad
    WASTE MANAGEMENT & RESEARCH, 2020, 38 (07) : 773 - 782
  • [48] Investment process for international construction projects
    Khazanet, V.L.
    Cost Engineering (Morgantown, West Virginia), 1996, 38 (07): : 38 - 44
  • [49] Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis
    He, Qinghua
    Luo, Lan
    Hu, Yi
    Chan, Albert P. C.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (03) : 549 - 563
  • [50] Research on the Process and Types of the Construction Projects
    Xie, Hai
    Liu, Xuan
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 2664 - +