Retrofit of aerodynamic cable instability on a cable-stayed bridge - Case study

被引:2
|
作者
Telang, NM [1 ]
Minervino, CM [1 ]
Norton, PG [1 ]
机构
[1] Lichtenstein Consulting Engineers Inc, Natick, MA 01760 USA
关键词
D O I
10.3141/1740-08
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Elegantly poised over the Mobile River, the twin pylons and the semi-harped cable stays of the Cochrane Bridge subtly complement the vast and undulating landscape of the Mobile Bay as the bridge carries US Route 90 over the Mobile River in Alabama. In February 1998, light rain drizzled on the bridge, and a weather station nearby recorded wind speeds of about 48 km/h (30 mph). Under these seemingly mild weather conditions, the normally immobile cable stays started to vibrate, and within moments, these nascent vibrations reached amplitudes of more than 1.2 m (4 ft). Alarmed by this event, the Alabama Department of Transportation (ALDOT) took immediate action to ensure the continued safety and serviceability of the bridge. A team of consultants was selected by ALDOT to investigate mitigation measures for the large-amplitude cable-stay vibrations. The fast-tracked comprehensive program planned and implemented to inspect, test, document, and evaluate the effects of the large-amplitude vibrations and the recommendation of retrofit measures that would limit future occurrences of such cable-stay vibrations on the Cochrane Bridge are described in detail.
引用
收藏
页码:61 / 67
页数:7
相关论文
共 50 条
  • [21] Cable-stayed pedestrian bridge
    Fernandez, P
    PCI JOURNAL, 2000, 45 (04): : 119 - 119
  • [22] An experimental approach on aerodynamic stability of a cable-stayed cantilever bridge
    Yoshizumi, F
    Inoue, H
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2002, 90 (12-15) : 2099 - 2111
  • [23] Analytical and aerodynamic investigation of the cable-stayed Helgeland-Bridge
    Analytische aerodynamische Untersuchung der Scharegkabelbruecke Helgeland
    Kovacs, Imre, 1600, (89):
  • [24] Research on seismic safety, retrofit, and design of a steel cable-stayed bridge
    Otsuka, H.
    Yamahira, K.
    Komiya, Y.
    ELECTRONIC JOURNAL OF STRUCTURAL ENGINEERING, 2008, 8 : 36 - 41
  • [25] Dynamic study of the Barqueta cable-stayed bridge
    Escuela Superior de Ingenieros, Universidad de Sevilla, Camino de los Descubrimientos s/n, 41092 Seville, Spain
    Conf. Proc. Soc. Exp. Mech. Ser.,
  • [26] Study on the influence of dent on aerodynamic performance of stay cables of cable-stayed bridge
    Liu Q.-K.
    Sun Y.-F.
    Zhang L.-J.
    Hu B.
    Ma W.-Y.
    Liu X.-B.
    Gongcheng Lixue/Engineering Mechanics, 2019, 36 : 272 - 277
  • [27] Study on the cable-stayed bridge subjected to vibration
    Lee, H. H.
    Chen, W. -H.
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 2243 - 2250
  • [28] Research on seismic safety, retrofit, and design of a steel cable-stayed bridge
    Otsuka, H.
    Yamahira, K.
    Komiya, Y.
    Electronic Journal of Structural Engineering, 2007, 7 (02): : 36 - 41
  • [29] Comparative Field Study of Cable Tension Measurement for a Cable-Stayed Bridge
    Cho, Soojin
    Yim, Jinsuk
    Shin, Sung Woo
    Jung, Hyung-Jo
    Yun, Chung-Bang
    Wang, Ming L.
    JOURNAL OF BRIDGE ENGINEERING, 2013, 18 (08) : 748 - 757
  • [30] Improvement of aerodynamic instability of cable-stayed bridge deck by separated flows mutual interference method
    Kubo, Yoshinobu
    Honda, Kenji
    Tasaki, Kenji
    Kato, Kusuo
    Journal of Wind Engineering and Industrial Aerodynamics, 1993, 49 (1-3 pt 1) : 553 - 564