Risk Analysis and Evaluation of Power Plant Equipment

被引:0
|
作者
Zhao, Weiwei [1 ]
Gu, Yujiong [1 ]
Wang, Chengcheng [1 ]
Ren, Zhaoxu [1 ]
机构
[1] North China Elect Power Univ, Minist Educ, Equipment Condit Monitoring & Fault Diag Res Inst, Beijing 102206, Peoples R China
来源
ENERGY DEVELOPMENT, PTS 1-4 | 2014年 / 860-863卷
关键词
Risk assessment; Fault; Maintenance mode;
D O I
10.4028/www.scientific.net/AMR.860-863.1690
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Because the complexity and The diversity of the fault of large-scale power generation equipment system, it is difficult to carry out the analysis and evaluation for risk of equipment failure definitely and accurately. In the present analysis, most of them are complex function formulas, and not only is it difficult to understand, but also in poor operating in practice. At the same time, it is fail to be divided according to different faults of different devices In the issue of risk classification in the present study, so that the risk classification is not reasonable. This article is based on the research about equipment failure risk assessment, and by risk factors analysis to classify the risk of different failure for different devices. Maintenance mode selection is no longer based on the device but a combination of criticality analysis, and we can propose appropriate maintenance mode in the light of different fault of different equipment.
引用
收藏
页码:1690 / 1693
页数:4
相关论文
共 50 条
  • [31] Asynchronous motors for nuclear power plant equipment
    Voroshilov V.S.
    Golembiovskii M.I.
    Zhirov V.V.
    Martynov O.V.
    Piskunov S.V.
    Russian Electrical Engineering, 2008, 79 (11) : 639 - 641
  • [32] THE INTRICACIES OF PURCHASING POWER-PLANT EQUIPMENT
    RITTENHOUSE, RC
    POWER ENGINEERING, 1985, 89 (09) : 30 - 38
  • [33] Noise barriers for power-plant equipment
    Tupov V.B.
    Semin S.A.
    Tupov B.V.
    Taratornin A.A.
    Rozanov D.A.
    Power Technology and Engineering, 2017, 50 (6) : 649 - 652
  • [34] Reliability analysis and safety evaluation on a nuclear power plant
    Meslin, T
    AGEING OF MATERIALS AND METHODS FOR THE ASSESSMENT OF LIFETIMES OF ENGINEERING PLANT - CAPE '97, 1997, : 95 - 95
  • [35] Advanced Thermodynamic Analysis and Evaluation of a Supercritical Power Plant
    Wang, Ligang
    Yang, Yongping
    Morosuk, Tatiana
    Tsatsaronis, George
    ENERGIES, 2012, 5 (06) : 1850 - 1863
  • [36] Research on Statistics & Analysis Evaluation Method of Electric Power Communication Equipment
    Wang Shi-wen
    Li-xiong
    Wang Chun-ying
    Shu Xin-jian
    MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 1665 - 1669
  • [37] Evaluation of operational behavior of equipment in power plants using vibration analysis
    Sudmersen, U
    Stegemann, D
    Pietsch, O
    Reimche, W
    Ybing, L
    MONITORING AND DIAGNOSIS IN POWER PLANTS, 1997, 1359 : 543 - 557
  • [38] Multi-criteria evaluation and priority analysis for localization equipment in a thermal power plant using the AHP (analytic hierarchy process)
    Yagmur, Levent
    ENERGY, 2016, 94 : 476 - 482
  • [39] Research on Thermal Power Plant Construction Project Risk Evaluation Based on AHP and Gray Relational analysis
    Li Jianqing
    Niu Dongxiao
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2009, : 62 - 65
  • [40] Risk Analysis and Safety Evaluation on combustion system of Gas-steam Combined Cycle Power Plant
    Sun, Zhongqiang
    MODERN TENDENCIES IN ENGINEERING SCIENCES, 2014, 533 : 354 - 359