In this article, conditions of natural flow and prospects to moving a major of production wells at field ''White Tiger'' and ''Dragon'' to artificial production are analyzed. Artificial lift options at conditions of high-deviated derth and high-temperature wells are discussed and also problems to increasing effectiveness of tubing in production at the wells which have high water-cut and high-paraffin are considered.