Utilities split on readiness of IGCC

被引:0
|
作者
Javetski, John
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
For some gencos, the dearth of operating experience for integrated gasification combined-cycle plants adds too much uncertainty to the risk/reward equation for new-capacity technology options. For others, the possibility of being able to comply with air pollution limits as far out as 2018, as well as to meet all-but-certain CO2 caps, makes IGCC well worth investing in-now.
引用
收藏
页码:55 / +
页数:4
相关论文
共 50 条
  • [41] IGCC Update: Are We There Yet?
    Neville, Angela
    POWER, 2009, 153 (08) : 52 - +
  • [42] Progress of the IGCC-Technology
    Schellberg, W
    Wolff, J
    Peña, FG
    BRENNSTOFF-WARME-KRAFT, 2000, 52 (06): : 49 - +
  • [43] PARAMETRIC STUDY OF ADVANCED IGCC
    Iki, Norihiko
    Tsutsumi, Atsushi
    Matsuzawa, Yoshiaki
    Furutani, Hirohide
    PROCEEDINGS OF ASME TURBO EXPO 2009, VOL 4, 2009, : 405 - 412
  • [44] EPA welcomes 50% IGCC
    不详
    TCE, 2006, (782): : 5 - 5
  • [45] IGCC系统的分析
    吴志刚
    魏琪
    翁锦萍
    江苏理工大学学报(自然科学版), 2000, (02) : 33 - 38
  • [46] 什么是IGCC技术?
    舟丹
    中外能源, 2012, 17 (04) : 42 - 42
  • [47] IGCC technology continues to develop
    Smith, DJ
    POWER ENGINEERING, 2003, 107 (11) : 102 - +
  • [48] IGCC DEMONSTRATION PLANT FOR PEAT
    AIJALA, M
    HUUSKONEN, E
    BIORESOURCE TECHNOLOGY, 1993, 46 (1-2) : 119 - 123
  • [49] Getting IGCC a seat at the table
    Blankinship, Steve
    POWER ENGINEERING, 2006, 110 (11) : 23 - 24
  • [50] Does IGCC Have a Future?
    Overton, Thomas W.
    POWER, 2014, 158 (07) : 54 - 55