Measurement and Risk Scales of Crane-Related Safety Factors on Construction Sites

被引:27
|
作者
Shapira, Aviad [1 ]
Simcha, Meir [1 ,2 ]
机构
[1] Technion Israel Inst Technol, Fac Civil & Environm Engn, IL-32000 Haifa, Israel
[2] Plaza Ctr Serbia & Balkans, Belgrade 11040, Serbia
关键词
IDENTIFYING ROOT CAUSES; BUILDING CONSTRUCTION; TOWER CRANES; ACCIDENTS; INJURIES; INDUSTRY; PROJECTS;
D O I
10.1061/(ASCE)CO.1943-7862.0000066
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper addresses quantitative measurement and risk scales of safety hazards on construction sites due to the work of tower cranes. Hazard measurement and risk scales are essential components of an integrated model aimed at quantitatively determining the safety level of individual construction sites, on a comparative basis. The paper focuses on two factors identified in earlier studies as considerably affecting safety on sites with tower cranes, "overlapping cranes" and "operator proficiency." These two factors are inherently different from each other in their characteristics and therefore also in the methods used to measure both the factors and the risk resulting from them. A probability-based method was prescribed for the measurement of overlapping cranes, while the analytical hierarchy process method and knowledge elicitation from experts were applied to develop metrics for operator proficiency. In both cases, an intimate understanding of the crane work environment is necessary. The uniform format and specific methodologies presented here can be used in the development of measurement techniques and risk scales for other safety factors concerning crane operation on construction sites.
引用
收藏
页码:979 / 989
页数:11
相关论文
共 50 条
  • [31] BIM-Based Safety Leading Indicators Measurement Tool for Construction Sites
    Mostafa Dadashi Haji
    Behrouz Behnam
    Mohammad Hassan Sebt
    Abdollah Ardeshir
    Ali Katooziani
    International Journal of Civil Engineering, 2023, 21 : 265 - 282
  • [32] Measurement of Safety Performance of Construction Sites Using the Improved Grey Correlation Analysis
    Zhong, Zuowei
    Xu, Peng
    Kang, Xiaolong
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3343 - +
  • [33] VICTIMIZATION - FEAR, PERCEIVED RISK, AND PERCEIVED SERIOUSNESS - CONSTRUCTION AND VALIDATION OF MEASUREMENT SCALES
    RAMOS, L
    ANDRADE, P
    REVISTA LATINOAMERICANA DE PSICOLOGIA, 1991, 23 (02): : 229 - 246
  • [34] A study on the effect of organizational factors on work sites safety in the construction industry in Japan
    Shoji, T
    Suzuki, Y
    Hanayasu, S
    Fukaya, K
    Egawa, Y
    Nakamura, T
    Kojima, M
    Hirose, A
    PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 1699 - 1704
  • [35] Survey datasets on categories of factors militating against safety practices on construction sites
    Ogundipe, Kunle E.
    Ogunbayo, Babatunde F.
    Ajao, Adekunle M.
    Ogundipe, Uyoyoghene L.
    Tunji-Olayeni, Patience F.
    DATA IN BRIEF, 2018, 19 : 2071 - 2078
  • [36] AHP-Based Weighting Factors Affecting Electrical Safety on Construction Sites
    Kan Hongsheng
    Zhao Jinxian
    Zhang Ying
    Liang Jinfeng
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 155 - +
  • [37] A Method Combined Entropy with AHP Weighting Factors Affecting Safety on Construction Sites
    Zhao Jinxian
    Kan Hongsheng
    Liang Jinfeng
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1403 - 1407
  • [38] Investigation and analysis of the safety risk factors of aging construction workers
    Fan, Xiaoting
    Wang, Daibing
    Tong, Zeng
    Wang, Xiaojuan
    SAFETY SCIENCE, 2023, 167
  • [39] Influence of Sociodemographic Factors on Construction Fieldworkers' Safety Risk Assessments
    Ibrahim, Abdullahi
    Nnaji, Chukwuma
    Shakouri, Mahmoud
    SUSTAINABILITY, 2022, 14 (01)
  • [40] Structuring risk factors related to airline cabin safety
    Hsu, Yueh-Ling
    Liu, Te-Chang
    JOURNAL OF AIR TRANSPORT MANAGEMENT, 2012, 20 : 54 - 56