Design optimization of bottom-hole assembly to reduce drilling vibration

被引:10
|
作者
Feng, Tianheng [1 ]
Bakshi, Soovadeep [1 ]
Gu, Qifan [1 ]
Yan, Zeyu [1 ]
Chen, Dongmei [1 ]
机构
[1] Univ Texas Austin, Dept Mech Engn, Austin, TX 78712 USA
关键词
Drilling vibration; Bottom-hole assembly; Finite element method; Genetic algorithm; Parallel computation; ROD;
D O I
10.1016/j.petrol.2019.04.107
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Drilling vibration has been considered as one of the major undesirable drill-string dynamics. This paper establishes a framework to optimize the design of the bottom hole assembly (BHA) such that the BHA structure is resilient against vibration. Firstly, a high-fidelity BHA model is established using the finite element method (FEM), which considers the buckling effects caused by the weight on bit (WOB) and the contact between stabilizers and wellbore. Then, vibration indices, such as the BHA strain energy and the stabilizer side force, are derived using the FEM model to evaluate BHA vibration. The stabilizer positions can determine the indices through influencing the boundary conditions; therefore, designing stabilizer positions to reduce drilling vibration can be formulated as an optimization problem to minimize the BHA vibration indices over the operational range. The cost function is non-convex within feasible domain and cannot be expressed explicitly in terms of stabilizer positions. The derivative-free genetic algorithm (GA) is selected to solve the non-convex problem, where parallel computation is implemented to expedite the computational process. For model verification, the finite element analysis of a BHA is conducted and compared against analytical solutions and existing literature and shows a good agreement. A production BHA is optimized following the proposed method. GA can optimize the stabilizer positions with high accuracy and low computational cost. The strain energy and stabilizer side force of the redesigned BHA are significantly reduced compared with the original design, which results in a much better BHA dynamic performance and less drilling vibration.
引用
收藏
页码:921 / 929
页数:9
相关论文
共 50 条
  • [41] IMPROVING THE RELIABILITY OF BOTTOM-HOLE DESIGN IN LOW-PERMEABLE RESERVOIRS
    ASHRAFYAN, MO
    LEBEDEV, OA
    NOVIKOV, AS
    BELKO, YA
    NEFTYANOE KHOZYAISTVO, 1991, (01): : 44 - 46
  • [42] Numerical Study of Composite Percussive Drilling With Consideration of Heat Transfer Between Drilling Fluid and Bottom-Hole Rock in Geothermal Drilling
    Song, Hengyu
    Xia, Yan
    Yuan, Guangjie
    Li, Jingcui
    Liu, Tianen
    Shi, Huaizhong
    Tang, Yinhong
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2023, 145 (06):
  • [43] RIG SITE COMPUTER OPTIMIZES BIT WEIGHT AGAINST HOLE ANGLE FOR BOTTOM-HOLE ASSEMBLY.
    Enen, Jack
    Callas, N.P.
    Sullivan, Wayne
    1600, (82):
  • [44] OPTIMIZATION OF HOLE DRILLING IN UNIT ASSEMBLY PROCESSES
    VALIKOV, V
    EGOROV, YD
    SOVIET ENGINEERING RESEARCH, 1987, 7 (08): : 44 - 46
  • [45] Numerical modelling of bottom-hole rock in underbalanced drilling using thermo-poroelastoplasticity model
    Liu, Weiji
    Zhou, Yunlai
    Zhu, Xiaohua
    Meng, Xiannan
    Liu, Mei
    Wahab, Magd Abdel
    STRUCTURAL ENGINEERING AND MECHANICS, 2019, 69 (05) : 537 - 545
  • [46] DIRECTIONAL DRILLING - 5. BEHAVIOR OF MULTIPLE-STABILIZER BOTTOM-HOLE ASSEMBLIES.
    Millheim, Keith
    Oil and Gas Journal, 1979, 77 (01): : 59 - 64
  • [47] Use of Bottom-Hole Engines in Eccentric Devices for Drilling Large-Diameter Wells.
    Antamanov, S.I.
    Zubkovskii, V.I.
    Lebedev, E.A.
    Bosenko, A.A.
    Ponomarenko, N.A.
    Oil Industry, 1978, (02): : 4 - 7
  • [48] Theoretical study of mode localization phenomenon in bottom-hole assemblies in oil-well drilling
    Yigit, AS
    Al-Ansary, MD
    Khalid, M
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1999, 121 (03): : 183 - 188
  • [49] ELECTROMECHANICAL CORE DRILLING TOOL ON A CARRYING CABLE FOR CLEANING BOTTOM-HOLE ZONES OF OIL WELLS
    Stadoid, S. S.
    JOURNAL OF MINING INSTITUTE, 2007, 173 : 105 - 108
  • [50] RESULTS OF INDUSTRIAL-TESTING OF BOTTOM-HOLE DRILL STEM ASSEMBLY WITH PORTABLE CENTRALIZER
    SUKHANOV, VB
    BARABASHKIN, II
    POVALIKHIN, AS
    SOROKIN, AN
    NEFTYANOE KHOZYAISTVO, 1990, (04): : 15 - 17