Algorithms for railway crew management

被引:116
|
作者
Caprara, A
Fischetti, M
Toth, P
Vigo, D
Guida, PL
机构
[1] UNIV BOLOGNA,DEIS,BOLOGNA,ITALY
[2] UNIV UDINE,DIPARTIMENTO MATEMAT & INFORMAT,I-33100 UDINE,ITALY
关键词
crew management; railway optimization; algorithms; crew scheduling and rostering;
D O I
10.1007/BF02614314
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Crew management is concerned with building the work schedules of crews needed to cover a planned timetable. This is a well-known problem in Operations Research and has been historically associated with airlines and mass-transit companies. More recently, railway applications have also come on the scene, especially in Europe. In practice, the overall crew management problem is decomposed into two subproblems, called crew scheduling and crew rostering. In this paper, we give an outline of different ways of modeling the two subproblems and possible solution methods. Two main solution approaches are illustrated for real-world applications. In particular we discuss in some detail the solution techniques currently adopted at the Italian railway company, Ferrovie dello State SpA, for solving crew scheduling and rostering problems. (C) 1997 The Mathematical Programming Society, Inc. Published by Elsevier Science B.V.
引用
收藏
页码:125 / 141
页数:17
相关论文
共 50 条
  • [41] An application of wedelin's method to railway crew scheduling problem
    School of Creative Science and Engineering, Waseda University, 3-4-1, Ohkubo, Shinjuku-ku, Tokyo 169-8555, Japan
    不详
    不详
    IEEJ Trans. Electron. Inf. Syst., 10 (1958-1967):
  • [42] A fast exact pricing algorithm for the railway crew scheduling problem
    van Rossum, B. T. C.
    OPERATIONS RESEARCH LETTERS, 2022, 50 (06) : 707 - 711
  • [43] Solving Practical Railway Crew Scheduling Problems with Attendance Rates
    Kirsten Hoffmann
    Udo Buscher
    Janis Sebastian Neufeld
    Felix Tamke
    Business & Information Systems Engineering, 2017, 59 : 147 - 159
  • [44] Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling
    Potthoff, Daniel
    Huisman, Dennis
    Desaulniers, Guy
    TRANSPORTATION SCIENCE, 2010, 44 (04) : 493 - 505
  • [45] STRESSES IN ELEMENTS OF METAL RAILWAY BRIDGES UNDER THE ACTION OF THE CREW
    Solonenko, V. G.
    Makhmetova, N. M.
    Musayev, J. S.
    Bekzhanova, S. E.
    Kvashnin, M. Ya
    NEWS OF THE NATIONAL ACADEMY OF SCIENCES OF THE REPUBLIC OF KAZAKHSTAN-SERIES OF GEOLOGY AND TECHNICAL SCIENCES, 2019, (02): : 159 - 165
  • [46] A hybrid constructive heuristic and simulated annealing for railway crew scheduling
    Hanafi, Rosmalina
    Kozan, Erhan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 70 : 11 - 19
  • [47] A column generation approach to railway crew recovery problem in disruption
    Imaizumi, Jun
    Miura, Rei
    Shigeta, Eiki
    Morito, Susumu
    IEEJ Transactions on Electronics, Information and Systems, 2014, 134 (03) : 418 - 424
  • [48] Column generation with dual inequalities for railway crew scheduling problems
    Nishi T.
    Muroi Y.
    Inuiguchi M.
    Public Transport, 2011, 3 (01) : 25 - 42
  • [49] Crew resource management training
    Penington, Johanne
    ERGONOMICS, 2021, 64 (12) : 1634 - 1635
  • [50] Erratum zu: Crew Resource Management im SchockraumErratum to: Crew resource management in emergency centers
    Christoph Kersten
    Katrin Fink
    Guido Michels
    Hans-Jörg Busch
    Medizinische Klinik - Intensivmedizin und Notfallmedizin, 2021, 116 (5) : 389 - 389