Collaboration barriers in BIM-based construction networks: A conceptual model

被引:157
|
作者
Oraee, Mehran [1 ]
Hosseini, M. Reza [2 ]
Edwards, David J. [3 ,4 ]
Li, Heng [5 ]
Papadonikolaki, Eleni [6 ]
Cao, Dongping [7 ]
机构
[1] Univ Melbourne, Fac Architecture Bldg & Planning, Parkville, Vic 3010, Australia
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
[3] Birmingham City Univ, Fac Technol Environm & Engn, Birmingham, W Midlands, England
[4] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
[5] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[6] UCL, Bartlett Sch Construct & Project Management, London, England
[7] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
关键词
BIM-enabled projects; Collaboration; Barriers; Team development; Virtual teams; TEAM COLLABORATION; LIFE-CYCLE; INFORMATION; DESIGN; MANAGEMENT; IMPLEMENTATION; PERFORMANCE; INTEROPERABILITY; ARCHITECTURE; ENVIRONMENT;
D O I
10.1016/j.ijproman.2019.05.004
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Building information modelling (BIM) teams, hereafter referred to as BIM-based construction networks, are teams whose possibly geographically dispersed members from various organisations and disciplines, perform project tasks on BIM-enabled projects. In recent years, BIM-based construction networks have progressively become the norm in executing BIM activities on projects. However, even though achieving BIM's full capabilities relies on effective collaboration among the team members in BIM-based construction networks, it is still a struggle for these members to collaborate. Nonetheless, only a few studies have been conducted to identify the barriers to strengthening team collaboration in BIM-based construction networks. To address this gap, the current study, by examining 73 journal articles on collaboration in BIM-based construction networks, builds upon a theoretical review of the literature. A conceptual model is presented to capture the main barriers to collaboration in BIM-based construction networks. The study benefits researchers as well as project managers. For researchers, the conceptual model provides an intermediate theory, namely, a theoretical basis to direct further knowledge creation attempts on the topic. In addition, the conceptual model supports project managers on BIM-enabled projects. That is, it simplifies the knowledge now available for practical applications enabling it to be translated into guidelines and practical instructions on real-life projects. (C) 2019 Elsevier Ltd, APM and IPMA. All rights reserved.
引用
收藏
页码:839 / 854
页数:16
相关论文
共 50 条
  • [21] Automated BIM-based process for wind engineering design collaboration
    Delavar, Mohammad
    Bitsuamlak, Girma T.
    Dickinson, John K.
    Costa, Leandro Malveira F.
    BUILDING SIMULATION, 2020, 13 (02) : 457 - 474
  • [22] Peer Pressure in BIM-Based Collaboration Improves Student Learning
    Zhao, Dong
    JOURNAL OF CIVIL ENGINEERING EDUCATION, 2021, 147 (02):
  • [23] Constructability and Sustainability Studies in Conceptual Projects: A BIM-Based Approach
    Barros, Belarmino Augusto F. S.
    Sotelino, Elisa D. D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (04)
  • [24] BIM-based Localization and Mapping for Mobile Robots in Construction
    Moura, Mateus Sanches
    Rizzo, Carlos
    Serrano, Daniel
    2021 IEEE INTERNATIONAL CONFERENCE ON AUTONOMOUS ROBOT SYSTEMS AND COMPETITIONS (ICARSC), 2021, : 12 - 18
  • [25] Offsite construction: Developing a BIM-Based optimizer for assembly
    Gbadamosi, Abdul-Quayyum
    Mahamadu, Abdul-Majeed
    Oyedele, Lukumon O.
    Akinade, Olugbenga O.
    Manu, Patrick
    Mahdjoubi, Lamine
    Aigbavboa, Clinton
    JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 1180 - 1190
  • [26] BIM-based code checking for construction health and safety
    Getuli, Vito
    Ventura, Silvia Mastrolembo
    Capone, Pietro
    Ciribini, Angelo L. C.
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 454 - 461
  • [27] Challenges in construction readiness for BIM-based building projects
    Radzi, Afiqah R.
    Azmi, Nur Farhana
    Kamaruzzaman, Syahrul Nizam
    Algahtany, Mohammed
    Rahman, Rahimi A.
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [28] A BIM-Based Code Checking Approach for Green Construction
    Jiang, Shaohua
    Wu, Zheng
    ICCREM 2017: INDUSTRY REGULATION AND SUSTAINABLE DEVELOPMENT, 2017, : 156 - 163
  • [29] Recognition of process patterns for BIM-based construction schedules
    Sigalov, Kateryna
    Konig, Markus
    ADVANCED ENGINEERING INFORMATICS, 2017, 33 : 456 - 472
  • [30] BIM-based Mixed Reality Application for Supervision of Construction
    Raimbaud, Pierre
    Lou, Ruding
    Merienne, Frederic
    Danglade, Florence
    Figueroa, Pablo
    Tiberio Hernandez, Jose
    2019 26TH IEEE CONFERENCE ON VIRTUAL REALITY AND 3D USER INTERFACES (VR), 2019, : 1903 - 1907