Effects of high-speed railway in tunnel on vibration response of upper building

被引:0
|
作者
Xu, Sihui [1 ]
Zhang, Xiaohui [1 ]
Chen, Han [1 ]
机构
[1] Tongji Univ, Minist Educ, Key Lab Rd & Traff Engn, Shanghai 201804, Peoples R China
关键词
Rail Transit; Vibration; Systematic dynamics; Tunnel-Building Integrated Structure; Evaded distance;
D O I
10.4028/www.scientific.net/AMM.482.155
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
In order to study the effects of high-speed railway in tunnel on vibration response of upper building, the Vehicle-Track-Tunnel-Soil-Building coupling dynamic model was established, and the reaction force of fasteners was used to transmit between Vehicle-Track coupling dynamic model and Tunnel-Soil-Building finite element model. According to modal analysis for typical section of building, sensitive frequency range and sensitive structure locations were obtained. In terms of two conditions, Tunnel-Building Integrated Structure and building are evaded from tunnel for some distance, 1/3 octave vibration level and VLZ vibration acceleration level for all measuring points were calculated to analyze the vibration response of building. The results are shown as follows: for Tunnel-Building Integrated Structure, the overall vibration level is high,which is above 65dB. 2-3dB will be reduced by decreasing speed and improving standard of track. when building is evaded from tunnel for some distance, with larger evaded distance, the vibration response is slighter. However, when evaded distance is above 30m, vibration may be amplified,so it's necessary to select proper distance. Vibration response of structure is most strong when 4 lines meet under building, so strict limitation on meeting condition of trains can effectively reduce vibration level.
引用
收藏
页码:155 / 162
页数:8
相关论文
共 50 条
  • [31] Wind-induced vibration response of high-speed railway catenary under moving tornado
    Lang, Tian-Yi
    Wang, Hao
    Liu, Zhen-Qing
    Zhang, Han
    Xu, Zi-Dong
    Gao, Hui
    Zhendong Gongcheng Xuebao/Journal of Vibration Engineering, 2022, 35 (04): : 969 - 975
  • [32] Numerical modelling of vibration response in loess hills due to a high-speed train on railway viaduct
    Yan, WuJian
    Zhang, Hang
    Zheng, HaiZhong
    Wu, ZhiJian
    Tian, XinXin
    RESEARCH IN COLD AND ARID REGIONS, 2022, 14 (05) : 329 - 337
  • [33] Analysis on the Influence of Cross Tunnel Construction on the Deformation of the Existing High-Speed Railway Tunnel
    Pan W.
    Gao Z.
    Zheng C.
    Gong Z.
    Geotechnical and Geological Engineering, 2018, 36 (6) : 4001 - 4013
  • [34] Mechanical characteristics of twin tunnel underneath construction on existing high-speed railway tunnel
    Fei, Ruizhen
    Peng, Limin
    Zhang, Chunlei
    Zhang, Jiqing
    Zhang, Peng
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 403 - 420
  • [35] Influence of discontinuous-type hood parameters on high-speed railway tunnel aerodynamic effects
    Geng, Feng
    Yang, Yifan
    Yu, Dingcheng
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND TRANSPORTATION 2015, 2016, 30 : 1235 - 1239
  • [36] Attenuation and distortion of a compression wave propagating in a high-speed railway tunnel
    Mashimo, Sh.
    Nakatsu, E.
    Aoki, T.
    Matsuo, K.
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 1996, 62 (597): : 1847 - 1854
  • [37] Aerodynamic Pressure Characteristics in Cracks of High-Speed Railway Tunnel Lining
    Chen Y.
    Gao Y.
    Zhao W.
    Ma W.
    Wang Z.
    Xu F.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (06): : 89 - 95
  • [38] An Application of Comprehensive Geological Prediction Methods in a High-Speed Railway Tunnel
    Yin, Peng
    Yao, Ruiting
    Ji, Xiaolei
    ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 : 279 - +
  • [39] Attenuation and distortion of a compression wave propagating in a high-speed railway tunnel
    Mashimo, S
    Nakatsu, E
    Aoki, T
    Matsuo, K
    JSME INTERNATIONAL JOURNAL SERIES B-FLUIDS AND THERMAL ENGINEERING, 1997, 40 (01) : 51 - 57
  • [40] A NUMERICAL STUDY ON THE EFFECT OF PRESSURE RELIEF IN A HIGH-SPEED RAILWAY TUNNEL
    Seo, Sang Yeon
    Ha, Heesang
    ROAD AND RAIL INFRASTRUCTURE V, 2018, : 1515 - 1524