Effects of high-speed railway in tunnel on vibration response of upper building

被引:0
|
作者
Xu, Sihui [1 ]
Zhang, Xiaohui [1 ]
Chen, Han [1 ]
机构
[1] Tongji Univ, Minist Educ, Key Lab Rd & Traff Engn, Shanghai 201804, Peoples R China
关键词
Rail Transit; Vibration; Systematic dynamics; Tunnel-Building Integrated Structure; Evaded distance;
D O I
10.4028/www.scientific.net/AMM.482.155
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
In order to study the effects of high-speed railway in tunnel on vibration response of upper building, the Vehicle-Track-Tunnel-Soil-Building coupling dynamic model was established, and the reaction force of fasteners was used to transmit between Vehicle-Track coupling dynamic model and Tunnel-Soil-Building finite element model. According to modal analysis for typical section of building, sensitive frequency range and sensitive structure locations were obtained. In terms of two conditions, Tunnel-Building Integrated Structure and building are evaded from tunnel for some distance, 1/3 octave vibration level and VLZ vibration acceleration level for all measuring points were calculated to analyze the vibration response of building. The results are shown as follows: for Tunnel-Building Integrated Structure, the overall vibration level is high,which is above 65dB. 2-3dB will be reduced by decreasing speed and improving standard of track. when building is evaded from tunnel for some distance, with larger evaded distance, the vibration response is slighter. However, when evaded distance is above 30m, vibration may be amplified,so it's necessary to select proper distance. Vibration response of structure is most strong when 4 lines meet under building, so strict limitation on meeting condition of trains can effectively reduce vibration level.
引用
收藏
页码:155 / 162
页数:8
相关论文
共 50 条
  • [1] Ground Vibration on High-Speed Railway Tunnel
    Watanabe, T.
    Sogabe, M.
    Yokoyama, H.
    Yonezawa, T.
    Kiyota, S.
    NOISE AND VIBRATION MITIGATION FOR RAIL TRANSPORTATION SYSTEMS, 2012, 118 : 299 - +
  • [2] Vibration reduction performance of rubber concrete backfill layer in high-speed railway tunnel
    Liang Y.
    Cai X.
    Zhang Y.
    Zhong Y.
    Noise and Vibration Worldwide, 2019, 50 (01): : 22 - 32
  • [3] Building a high-speed railway station in Girona
    Baldellou, V. Pujol
    Acosta, J. Tomas
    Moreno, C. Ramos
    Bengoechea, Á.C. Aparicio
    Schneider, G. Ramos
    Civil-Comp Proceedings, 2012, 98
  • [4] Comprehensive prediction of rockburst in high-speed railway tunnel
    Li, Bo
    Wu, Li
    Xu, Changmao
    Li, Zhigang
    Zuo, Qingjun
    APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 553 - +
  • [5] THE GRAUHOLZ HIGH-SPEED RAILWAY TUNNEL IN DIFFICULT GROUND
    STEINER, W
    TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 333 - 339
  • [6] Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests
    Zhang, Jingyu
    Zhang, Mingjin
    Li, Yongle
    Fang, Chen
    WIND AND STRUCTURES, 2019, 28 (04) : 203 - 213
  • [7] Vibration response prediction and vibration safety assessment method for building structures around viaducts under the action of high-speed railway trains
    Zhou, Zhiyang
    Jia, Baoxin
    Yuan, Wenya
    Zhang, Jing
    CONSTRUCTION AND BUILDING MATERIALS, 2024, 422
  • [8] Blast vibration of a large-span high-speed railway tunnel based on microseismic monitoring
    Li, Ao
    Fang, Qian
    Zhang, Dingli
    Luo, Jiwei
    Hong, Xuefei
    SMART STRUCTURES AND SYSTEMS, 2018, 21 (05) : 561 - 569
  • [9] Study on vibration reduction slab track and adjacent transition section in high-speed railway tunnel
    Xu, Qingyuan
    Chen, Xiaoping
    Yan, Bin
    Guo, Wei
    JOURNAL OF VIBROENGINEERING, 2015, 17 (02) : 905 - 916
  • [10] Study and field measurement of environmental vibration induced by underground high-speed railway in Shiziyang tunnel
    Xiao, Mingqing
    Yao, Jie
    Huang, Dun
    Yang, Guanghua
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2013, 32 (SUPPL.2): : 3527 - 3534