Cold standby repairable system with working vacations and vacation interruption

被引:1
|
作者
Liu, Baoliang [1 ]
Cui, Lirong [2 ]
Wen, Yanqing [1 ]
机构
[1] Shanxi Datong Univ, Coll Math & Comp Sci, Datong 037009, Peoples R China
[2] Beijing Inst Technol, Sch Management & Econ, Beijing 100081, Peoples R China
基金
中国国家自然科学基金;
关键词
reliability; phase-type (PH) distribution; multiple vacations; working vacations; vacation interruption; rate of occurrence of failure; MARKOVIAN ARRIVAL PROCESS; PHASE; TIMES; DISTRIBUTIONS; RELIABILITY; 2-SYSTEM; FAILURE; QUEUE;
D O I
10.1109/JSEE.2015.00122
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies a cold standby repairable system with working vacations and vacation interruption. The repairman's multiple vacations policy, the working vacations policy and the vacation interruption are considered simultaneously. The lifetime of components follows a phase-type (PH) distribution. The repair time in the regular repair period and the working vacation period follow other two PH distributions at different rates. For this system, the vector-valued Markov process governing the system is constructed. We obtain several important performance measures for the system in transient and stationary regimes applying matrix-analytic methods. Finally, a numerical example is given to illustrate the results obtained.
引用
收藏
页码:1127 / 1134
页数:8
相关论文
共 50 条