Industry 4.0: Smart Scheduling

被引:211
作者
Alejandro Rossit, Daniel [1 ,2 ]
Tohme, Fernando [2 ,3 ]
Frutos, Mariano [1 ,4 ]
机构
[1] Univ Nacl Sur, Dept Engn, Bahia Blanca, Buenos Aires, Argentina
[2] UNS, Dept Matemat, CONICET, INMABB, Bahia Blanca, Buenos Aires, Argentina
[3] Univ Nacl Sur, Dept Econ, Bahia Blanca, Buenos Aires, Argentina
[4] UNS, CONICET, IIESS, Dept Econ, Bahia Blanca, Buenos Aires, Argentina
关键词
scheduling; Industry; 4; 0; Smart Manufacturing; Cyber-Physical Systems; decision-making; dynamic scheduling; inverse scheduling; SYSTEMS; OPTIMIZATION;
D O I
10.1080/00207543.2018.1504248
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Smart Manufacturing and Industry 4.0 production environments integrate the physical and decisional aspects of manufacturing processes into autonomous and decentralised systems. One of the main aspects in these systems is production planning, in particular scheduling operations on machines. We introduce here a new decision-making schema, Smart Scheduling, intended to yield flexible and efficient production schedules on the fly, taking advantage of the features of these new environments. The ability to face unforeseen and disruptive events is one of the main improvements in our proposed schema, which uses an efficient screening procedure (Tolerance Scheduling) to lessen the need of rescheduling in the face of those events.
引用
收藏
页码:3802 / 3813
页数:12
相关论文
共 37 条
[1]   Performance computation methods for composition of tasks with multiple patterns in cloud manufacturing [J].
Ahn, Gilseung ;
Park, You-Jin ;
Hur, Sun .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (02) :517-530
[2]   Inverse optimization [J].
Ahuja, RK ;
Orlin, JB .
OPERATIONS RESEARCH, 2001, 49 (05) :771-783
[3]   Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm [J].
Al-Hinai, Nasr ;
ElMekkawy, T. Y. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 132 (02) :279-291
[4]   The Non-Permutation Flow-Shop scheduling problem: A literature review [J].
Alejandro Rossit, Daniel ;
Tohme, Fernando ;
Frutos, Mariano .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 77 :143-153
[5]  
[Anonymous], CONNECT TISSUE RES
[6]  
[Anonymous], 2015, INT J PRODUCTION RES, DOI DOI 10.1080/00207543.2014.955925
[7]   Inverse scheduling: two-machine flow-shop problem [J].
Brucker, Peter ;
Shakhlevich, Natalia V. .
JOURNAL OF SCHEDULING, 2011, 14 (03) :239-256
[8]   Inverse scheduling with maximum lateness objective [J].
Brucker, Peter ;
Shakhlevich, Natalia V. .
JOURNAL OF SCHEDULING, 2009, 12 (05) :475-488
[9]  
Dolgui A, 2019, INT J PROD RES, V57, P411, DOI [10.1080/00207543.2018.1442948, 10.1080/00207543.2018.1429119]
[10]  
Framinan J.M., 2014, Manufacturing Scheduling Systems: An Integrated View on Models, Methods and Tools, DOI DOI 10.1007/978-1-4471-6272-8