Calculation of the Vertical Strata Load of Utility Tunnel Crossing Ground Fissure Zone

被引:0
|
作者
Zhang, Dan [1 ]
Hu, Zhiping [1 ,2 ]
Lu, Ganggang [1 ]
Wang, Rui [1 ]
Ren, Xiang [1 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian 710061, Peoples R China
[2] Changan Univ, Inst Underground Struct & Engn, Xian 710061, Peoples R China
基金
中国国家自然科学基金;
关键词
LAND SUBSIDENCE; EARTH FISSURES; ORIGIN; MECHANISM; PRESSURE; VALLEY; FAULT; XIAN;
D O I
10.1155/2020/8877016
中图分类号
O42 [声学];
学科分类号
070206 ; 082403 ;
摘要
A ground fissure is a geological disaster in which the vertical dislocation of strata causes surface rupture. Ground fissures can cause extreme harm to the surface and underground buildings. Ground fissure activity can result in different settlement on the two sides of the strata, which will generate additional stress (pressure) that differs from the stress of the general stratum on underground structures across the ground fissure zone. It is essential to assess the effective stress of strata in the design of underground engineering structures across a ground fissure zone. The Xi'an ground fissure through a utility tunnel was focus of the research, and a physical model and data for oblique crossing of the 45 degrees ground fissure were analyzed. A model of the utility tunnel structure was established, including the surrounding soil load as an active ground fissure environment. This model was used to calculate the vertical formation pressure of the overlying soil on the utility tunnel. A method to calculate the overlying load on the utility tunnel caused by ground fissure activity was proposed and compared with the calculation based on the A. Marston principle. The results showed that the ground fissure load calculation method based on the strata-holding effect can effectively calculate the earth pressure of the surrounding soil layer of the utility tunnel in the cross-ground fissure section. The results of this work provide guidance and reference value for the design of a utility tunnel in an area with the potential for a ground fissure.
引用
收藏
页数:12
相关论文
共 41 条
  • [31] Analysis on interaction mechanism between tunnel structure and surrounding soil under action of vertical ground-fissure
    Shao, Sheng-Jun
    She, Fang-Tao
    Zheng, Wan-Kun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2011, 45 (05): : 634 - 638
  • [32] Improved vertical displacement calculation model for immersed tube tunnel considering tidal load
    Zhou, Huanzhu
    Wang, Lechen
    Jiang, Binsong
    Wang, Yanning
    MARINE GEORESOURCES & GEOTECHNOLOGY, 2022, 40 (09) : 1073 - 1083
  • [33] Research on Safety Early Warning Standard of Large-Scale Underground Utility Tunnel in Ground Fissure Active Period
    Wang, X. Y.
    Ma, Z.
    Zhang, Y. T.
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [34] Study on Dynamic Response of High-speed Railway Subgrade Crossing Ground Fissure Zone and Optimization of Foundation Reinforcement of CFG Piles
    Huang Q.
    Wang T.
    Liu Y.
    He G.
    Tiedao Xuebao/Journal of the China Railway Society, 2020, 42 (01): : 103 - 111
  • [35] Test study of 3d deformation feature of special movement joint of sectional horseshoe-shaped tunnel crossing ground fissure
    School of Civil Engineering, Chang'an University, Xi'an, Shaanxi 710061, China
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2009, 12 (2475-2481):
  • [36] Study on calculation of shield tunnel shearing dislocation platform deformation due to adjacent ground stacked load
    Wei G.
    Yu G.
    Hong W.
    Wei, Gang (weig@zucc.edu.cn), 1775, Central South University of Technology (49): : 1775 - 1783
  • [37] Three-Dimensional Calculation on Vertical Soil Displacement of Shield Tunnel Induced by Ground Loss Considering Consolidation
    Zhang, Wenjun
    Jin, Mingming
    Lei, Huayang
    Kong, Heng
    Guo, Caixia
    TRANSPORTATION RESEARCH CONGRESS 2016: INNOVATIONS IN TRANSPORTATION RESEARCH INFRASTRUCTURE: PROCEEDINGS OF THE TRANSPORTATION RESEARCH CONGRESS 2016, 2018, : 553 - 568
  • [38] Vertical Load and Settlement at the Foot of Steel Rib with the Support of Feet-Lock Pipe in Soft Ground Tunnel
    Chen, Lijun
    Chen, Jianxun
    Luo, Yanbin
    Li, Yao
    Hu, Taotao
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [39] Numerical Analysis of the Dynamic Response of a High-Speed Railway Foundation across a Ground Fissure Zone-A Case Study of the Datong-Xi'an High-Speed Railway Crossing a Ground Fissure in the Taiyuan Basin, China
    Xie, Qingyu
    Huang, Qiangbing
    Miao, Chenyang
    Gao, Linfeng
    He, Guohui
    APPLIED SCIENCES-BASEL, 2024, 14 (20):
  • [40] Vertical ground movements in the Southern Zone Of Tolbachik Cinder Cones after the end of the 1975–1976 Great Tolbachik Fissure Eruption and possible causes of the movements
    M. A. Magus’kin
    V. M. Magus’kin
    Journal of Volcanology and Seismology, 2017, 11 : 377 - 388